104 delay minutes

The biggest share (36%) of the delay picked up at Harwich Town in the four weeks to 9 December 2023 came from signal, points and power faults.

84% of these minutes were knock-on from something that happened elsewhere first. 93% of them were agreed between Network Rail and the operators when the file came out on 5 Jan 2024, so they may still move.

By cause

Delay minutes by cause in 2023-24 P09
CauseMinutesShareNetwork-wideA day, against the same period other yearsTrains cancelled
Network Rail's causes
Track66%8% 0 a day, the least in 5 years-
Signals, points and power3736%16% 1 a day, more than 2 of the other 4 years-
Weather and structures--7% 0 a day, the least in 5 years-
Autumn65%7% 0 a day, more than 1 of the other 4 years-
External77%4% 0 a day, more than 2 of the other 4 years-
Network management55%17% 0 a day, the least in 5 years-
The operators' causes
Train faults--16% 0 a day, the least in 5 years-
Traincrew1010%11% 0 a day, more than 2 of the other 4 years-
Stations2524%3% 1 a day, the most in 5 years-
Operations--5% 0 a day, the least in 5 years4
Operator, other98%7% 0 a day, more than 1 of the other 4 years-

Period by period

Delay minutes a day, period by period. Gridlines every 10 minutes. Hatched periods were under 94% agreed when their file came out, so they may still move. Pick a bar to see that period.

The codes behind it

In 2023-24 P09
CodeWhat Network Rail loggedMinutes
RQUn-booked assistance for a person with reduced mobility joining/alighting,22
IASignal failure (including no fault found)10
TGDriver10
I1Overhead line/third rail defect7
IDLevel crossing faults and failure incl. barrow/foot crossings and crossing treadles7
J0Telecom equipment radio failure (GSM-R)7
XNRoad or crossing related incidents inc. cars on line, crossing misuse and priority to emergency services (NOT bridge strikes)7
ISTrack defects (other than rail defects) inc. fish plates, wet beds etc.6
Q3NZ Pumps T6
QAWTT schedule and or LTP Process including erroneous simplifiers5
Since 2018
CodeWhat Network Rail loggedMinutes
OTOps Safety TSR implemented for sighting issues relating to foot crossings, level crossings or signals (Not vegetation caused)1,405
ISTrack defects (other than rail defects) inc. fish plates, wet beds etc.969
TGDriver385
IASignal failure (including no fault found)365
ICTrack circuit failure (including no fault found)307
MDTechnical failures below the solebar255
RQUn-booked assistance for a person with reduced mobility joining/alighting,238
OWConn held where the prime incident causing delay to the incoming train is a FOC owned incident & serv is more freq than hourly225
M8Technical failures above the Solebar213
JLSafety related incident caused by maintenance or infrastructure staff oversight or error (not Operations staff)195