Haltwhistle
259 delay minutes
The biggest share (19%) of the delay picked up at Haltwhistle in the four weeks to 9 December 2023 came from other operator causes.
21% of these minutes were knock-on from something that happened elsewhere first. 95% of them were agreed between Network Rail and the operators when the file came out on 5 Jan 2024.
By cause
| Cause | Minutes | Share | Network-wide | A day, against the same period other years | Trains cancelled |
|---|---|---|---|---|---|
| Network Rail's causes | |||||
| Track | - | - | 8% | 0 a day, the least in 5 years | - |
| Signals, points and power | 7 | 3% | 16% | 0 a day, the least in 5 years | - |
| Weather and structures | 41 | 16% | 7% | 1 a day, the most in 5 years | - |
| Autumn | 42 | 16% | 7% | 2 a day, the least in 5 years | - |
| External | 18 | 7% | 4% | 1 a day, the most in 5 years | - |
| Network management | 43 | 17% | 17% | 2 a day, more than 3 of the other 4 years | - |
| The operators' causes | |||||
| Train faults | 47 | 18% | 16% | 2 a day, more than 2 of the other 4 years | - |
| Traincrew | 3 | 1% | 11% | 0 a day, more than 1 of the other 4 years | - |
| Stations | - | - | 3% | 0 a day, the least in 5 years | - |
| Operations | 9 | 3% | 5% | 0 a day, more than 3 of the other 4 years | - |
| Operator, other | 49 | 19% | 7% | 2 a day, more than 2 of the other 4 years | - |
Period by period
The codes behind it
| Code | What Network Rail logged | Minutes |
|---|---|---|
| Q3 | NZ Pumps T | 42 |
| TT | Leaf fall Neutral | 42 |
| X4 | Blanket speed restrictions or Key Route Strategy implemented with Group Standards or national operational safety instructions | 41 |
| M8 | Technical failures above the Solebar | 31 |
| OU | Delays not Investigated by Network Rail | 25 |
| OC | Signaller including mis-routing (not ERTM /ETCS related) | 18 |
| XN | Road or crossing related incidents inc. cars on line, crossing misuse and priority to emergency services (NOT bridge strikes) | 18 |
| MD | Technical failures below the solebar | 16 |
| TO | Time lost en-route believed to be Operator cause and information required form operatore (Ops Responsibility) | 9 |
| IH | Power Supply And Distribution System Failure | 7 |
| Code | What Network Rail logged | Minutes |
|---|---|---|
| Q3 | NZ Pumps T | 720 |
| MD | Technical failures below the solebar | 703 |
| IC | Track circuit failure (including no fault found) | 685 |
| IA | Signal failure (including no fault found) | 590 |
| X4 | Blanket speed restrictions or Key Route Strategy implemented with Group Standards or national operational safety instructions | 515 |
| IB | Points failure (including no fault found) | 493 |
| IF | Train Describer/Panel/ARS/SSI/TDM Remote Control failure | 475 |
| TG | Driver | 464 |
| XN | Road or crossing related incidents inc. cars on line, crossing misuse and priority to emergency services (NOT bridge strikes) | 449 |
| TT | Leaf fall Neutral | 442 |