Harlow Town
1,010 delay minutes
Most of the delay picked up at Harlow Town in the four weeks to 9 December 2023 came from how the network was run.
50% of these minutes were knock-on from something that happened elsewhere first. 54% of them were agreed between Network Rail and the operators when the file came out on 5 Jan 2024, so they may still move.
By cause
| Cause | Minutes | Share | Network-wide | A day, against the same period other years | Trains cancelled |
|---|---|---|---|---|---|
| Network Rail's causes | |||||
| Track | 84 | 8% | 8% | 3 a day, more than 1 of the other 4 years | - |
| Signals, points and power | 47 | 5% | 16% | 2 a day, more than 1 of the other 4 years | - |
| Weather and structures | 12 | 1% | 7% | 0 a day, more than 1 of the other 4 years | - |
| Autumn | 18 | 2% | 7% | 1 a day, more than 2 of the other 4 years | - |
| External | 48 | 5% | 4% | 2 a day, more than 1 of the other 4 years | - |
| Network management | 548 | 54% | 17% | 20 a day, the most in 5 years | 2 |
| The operators' causes | |||||
| Train faults | 136 | 13% | 16% | 5 a day, more than 1 of the other 4 years | 2 |
| Traincrew | 44 | 4% | 11% | 2 a day, more than 2 of the other 4 years | - |
| Stations | 22 | 2% | 3% | 1 a day, more than 2 of the other 4 years | - |
| Operations | 30 | 3% | 5% | 1 a day, more than 3 of the other 4 years | - |
| Operator, other | 21 | 2% | 7% | 1 a day, the least in 5 years | - |
Period by period
The codes behind it
| Code | What Network Rail logged | Minutes |
|---|---|---|
| OT | Ops Safety TSR implemented for sighting issues relating to foot crossings, level crossings or signals (Not vegetation caused) | 391 |
| IS | Track defects (other than rail defects) inc. fish plates, wet beds etc. | 73 |
| JP | Failure to maintain vegetation within network boundaries in accordance with prevailing Network Rail standards | 50 |
| M7 | Door and Door system faults | 46 |
| XP | BRIDGE HIT | 45 |
| MN | Brake and brake systems faults; including wheel flats where no other cause had been identified | 43 |
| TG | Driver | 42 |
| I8 | Animal Strike or Incursion within the control of Network Rail | 30 |
| I2 | AC/DC trip (including no fault or cause found) | 28 |
| TO | Time lost en-route believed to be Operator cause and information required form operatore (Ops Responsibility) | 24 |
| Code | What Network Rail logged | Minutes |
|---|---|---|
| IS | Track defects (other than rail defects) inc. fish plates, wet beds etc. | 10,044 |
| IR | Broken/cracked/twisted/buckled/flawed rail | 3,808 |
| MD | Technical failures below the solebar | 3,629 |
| IB | Points failure (including no fault found) | 3,069 |
| M8 | Technical failures above the Solebar | 2,752 |
| TG | Driver | 2,490 |
| IC | Track circuit failure (including no fault found) | 2,164 |
| IF | Train Describer/Panel/ARS/SSI/TDM Remote Control failure | 2,115 |
| M7 | Door and Door system faults | 1,954 |
| MN | Brake and brake systems faults; including wheel flats where no other cause had been identified | 1,759 |