Heathrow Terminal 5
2,859 delay minutes
The biggest share (37%) of the delay picked up at Heathrow Terminal 5 in the four weeks to 9 December 2023 came from faulty trains.
78% of these minutes were knock-on from something that happened elsewhere first. 65% of them were agreed between Network Rail and the operators when the file came out on 5 Jan 2024, so they may still move.
By cause
| Cause | Minutes | Share | Network-wide | A day, against the same period other years | Trains cancelled |
|---|---|---|---|---|---|
| Network Rail's causes | |||||
| Track | 463 | 16% | 8% | 17 a day, the most in 5 years | 4 |
| Signals, points and power | 146 | 5% | 16% | 5 a day, the most in 5 years | 67 |
| Weather and structures | 27 | <1% | 7% | 1 a day, the most in 5 years | - |
| Autumn | 1 | <1% | 7% | 0 a day, more than 2 of the other 4 years | - |
| External | 14 | <1% | 4% | 1 a day, more than 3 of the other 4 years | - |
| Network management | 322 | 11% | 17% | 12 a day, the most in 5 years | 5 |
| The operators' causes | |||||
| Train faults | 1,070 | 37% | 16% | 38 a day, the most in 5 years | 150 |
| Traincrew | 307 | 11% | 11% | 11 a day, the most in 5 years | 10 |
| Stations | 9 | <1% | 3% | 0 a day, more than 3 of the other 4 years | - |
| Operations | 310 | 11% | 5% | 11 a day, the most in 5 years | 4 |
| Operator, other | 190 | 7% | 7% | 7 a day, more than 3 of the other 4 years | 3 |
Period by period
The codes behind it
| Code | What Network Rail logged | Minutes |
|---|---|---|
| M2 | Delay due to ATO / ETCS equipment | 718 |
| TG | Driver | 304 |
| TX | Delays incurred on non-Network Rail running lines or networks including London Underground (except fleet related delays) | 294 |
| IR | Broken/cracked/twisted/buckled/flawed rail | 260 |
| OU | Delays not Investigated by Network Rail | 211 |
| IS | Track defects (other than rail defects) inc. fish plates, wet beds etc. | 189 |
| IC | Track circuit failure (including no fault found) | 140 |
| MT | Confirmed train borne safety system faults (not cab based) | 91 |
| M7 | Door and Door system faults | 90 |
| IA | Signal failure (including no fault found) | 88 |
| Code | What Network Rail logged | Minutes |
|---|---|---|
| M2 | Delay due to ATO / ETCS equipment | 17,519 |
| TG | Driver | 2,779 |
| TX | Delays incurred on non-Network Rail running lines or networks including London Underground (except fleet related delays) | 2,388 |
| M8 | Technical failures above the Solebar | 2,028 |
| IC | Track circuit failure (including no fault found) | 1,965 |
| M7 | Door and Door system faults | 1,790 |
| IB | Points failure (including no fault found) | 1,578 |
| IR | Broken/cracked/twisted/buckled/flawed rail | 1,392 |
| I1 | Overhead line/third rail defect | 1,232 |
| IS | Track defects (other than rail defects) inc. fish plates, wet beds etc. | 1,076 |