Heathrow Terminals 2 & 3
1,309 delay minutes
The biggest share (39%) of the delay picked up at Heathrow Terminals 2 & 3 in the four weeks to 9 December 2023 came from faulty trains.
57% of these minutes were knock-on from something that happened elsewhere first. 70% of them were agreed between Network Rail and the operators when the file came out on 5 Jan 2024, so they may still move.
By cause
| Cause | Minutes | Share | Network-wide | A day, against the same period other years | Trains cancelled |
|---|---|---|---|---|---|
| Network Rail's causes | |||||
| Track | 122 | 9% | 8% | 4 a day, the most in 5 years | - |
| Signals, points and power | 275 | 21% | 16% | 10 a day, the most in 5 years | 2 |
| Weather and structures | 14 | 1% | 7% | 1 a day, the most in 5 years | - |
| Autumn | - | - | 7% | Not enough other years | - |
| External | 4 | <1% | 4% | 0 a day, more than 3 of the other 4 years | - |
| Network management | 79 | 6% | 17% | 3 a day, the most in 5 years | 5 |
| The operators' causes | |||||
| Train faults | 512 | 39% | 16% | 18 a day, the most in 5 years | 12 |
| Traincrew | 164 | 13% | 11% | 6 a day, the most in 5 years | 3 |
| Stations | 1 | <1% | 3% | 0 a day, more than 2 of the other 4 years | - |
| Operations | 61 | 5% | 5% | 2 a day, the most in 5 years | - |
| Operator, other | 77 | 6% | 7% | 3 a day, more than 3 of the other 4 years | 1 |
Period by period
The codes behind it
| Code | What Network Rail logged | Minutes |
|---|---|---|
| M2 | Delay due to ATO / ETCS equipment | 369 |
| IC | Track circuit failure (including no fault found) | 267 |
| TG | Driver | 156 |
| IS | Track defects (other than rail defects) inc. fish plates, wet beds etc. | 68 |
| TX | Delays incurred on non-Network Rail running lines or networks including London Underground (except fleet related delays) | 57 |
| IA | Signal failure (including no fault found) | 50 |
| IR | Broken/cracked/twisted/buckled/flawed rail | 48 |
| OU | Delays not Investigated by Network Rail | 46 |
| MT | Confirmed train borne safety system faults (not cab based) | 39 |
| MB | Electic Loco failure, defect, attention | 37 |
| Code | What Network Rail logged | Minutes |
|---|---|---|
| M2 | Delay due to ATO / ETCS equipment | 13,957 |
| TG | Driver | 2,159 |
| M7 | Door and Door system faults | 1,559 |
| IK | Telecom equipment failure (including no fault found) | 1,500 |
| IC | Track circuit failure (including no fault found) | 1,283 |
| M8 | Technical failures above the Solebar | 1,127 |
| VH | Passenger Communication cord, door egress or emergency train alarm operated | 869 |
| J3 | Axle Counter Failure | 779 |
| MT | Confirmed train borne safety system faults (not cab based) | 738 |
| IA | Signal failure (including no fault found) | 625 |