1,309 delay minutes

The biggest share (39%) of the delay picked up at Heathrow Terminals 2 & 3 in the four weeks to 9 December 2023 came from faulty trains.

57% of these minutes were knock-on from something that happened elsewhere first. 70% of them were agreed between Network Rail and the operators when the file came out on 5 Jan 2024, so they may still move.

By cause

Delay minutes by cause in 2023-24 P09
CauseMinutesShareNetwork-wideA day, against the same period other yearsTrains cancelled
Network Rail's causes
Track1229%8% 4 a day, the most in 5 years-
Signals, points and power27521%16% 10 a day, the most in 5 years2
Weather and structures141%7% 1 a day, the most in 5 years-
Autumn--7%Not enough other years-
External4<1%4% 0 a day, more than 3 of the other 4 years-
Network management796%17% 3 a day, the most in 5 years5
The operators' causes
Train faults51239%16% 18 a day, the most in 5 years12
Traincrew16413%11% 6 a day, the most in 5 years3
Stations1<1%3% 0 a day, more than 2 of the other 4 years-
Operations615%5% 2 a day, the most in 5 years-
Operator, other776%7% 3 a day, more than 3 of the other 4 years1

Period by period

Delay minutes a day, period by period. Gridlines every 20 minutes. Hatched periods were under 94% agreed when their file came out, so they may still move. Pick a bar to see that period.

The codes behind it

In 2023-24 P09
CodeWhat Network Rail loggedMinutes
M2Delay due to ATO / ETCS equipment369
ICTrack circuit failure (including no fault found)267
TGDriver156
ISTrack defects (other than rail defects) inc. fish plates, wet beds etc.68
TXDelays incurred on non-Network Rail running lines or networks including London Underground (except fleet related delays)57
IASignal failure (including no fault found)50
IRBroken/cracked/twisted/buckled/flawed rail48
OUDelays not Investigated by Network Rail46
MTConfirmed train borne safety system faults (not cab based)39
MBElectic Loco failure, defect, attention37
Since 2018
CodeWhat Network Rail loggedMinutes
M2Delay due to ATO / ETCS equipment13,957
TGDriver2,159
M7Door and Door system faults1,559
IKTelecom equipment failure (including no fault found)1,500
ICTrack circuit failure (including no fault found)1,283
M8Technical failures above the Solebar1,127
VHPassenger Communication cord, door egress or emergency train alarm operated869
J3Axle Counter Failure779
MTConfirmed train borne safety system faults (not cab based)738
IASignal failure (including no fault found)625