Heyford
116 delay minutes
The biggest share (37%) of the delay picked up at Heyford in the four weeks to 9 December 2023 came from faulty trains.
45% of these minutes were knock-on from something that happened elsewhere first. 85% of them were agreed between Network Rail and the operators when the file came out on 5 Jan 2024, so they may still move.
By cause
| Cause | Minutes | Share | Network-wide | A day, against the same period other years | Trains cancelled |
|---|---|---|---|---|---|
| Network Rail's causes | |||||
| Track | 8 | 7% | 8% | 0 a day, more than 1 of the other 4 years | - |
| Signals, points and power | 27 | 23% | 16% | 1 a day, more than 2 of the other 4 years | - |
| Weather and structures | 9 | 8% | 7% | 0 a day, more than 3 of the other 4 years | - |
| Autumn | 2 | 2% | 7% | 0 a day, the least in 5 years | - |
| External | - | - | 4% | 0 a day, the least in 5 years | - |
| Network management | 19 | 16% | 17% | 1 a day, more than 2 of the other 4 years | - |
| The operators' causes | |||||
| Train faults | 43 | 37% | 16% | 2 a day, the most in 5 years | - |
| Traincrew | 6 | 5% | 11% | 0 a day, more than 1 of the other 4 years | - |
| Stations | - | - | 3% | 0 a day, the least in 5 years | - |
| Operations | - | - | 5% | 0 a day, the least in 5 years | - |
| Operator, other | 2 | 2% | 7% | 0 a day, the least in 5 years | - |
Period by period
The codes behind it
| Code | What Network Rail logged | Minutes |
|---|---|---|
| M7 | Door and Door system faults | 35 |
| ID | Level crossing faults and failure incl. barrow/foot crossings and crossing treadles | 19 |
| I8 | Animal Strike or Incursion within the control of Network Rail | 6 |
| IF | Train Describer/Panel/ARS/SSI/TDM Remote Control failure | 5 |
| MD | Technical failures below the solebar | 5 |
| X4 | Blanket speed restrictions or Key Route Strategy implemented with Group Standards or national operational safety instructions | 5 |
| IR | Broken/cracked/twisted/buckled/flawed rail | 4 |
| IS | Track defects (other than rail defects) inc. fish plates, wet beds etc. | 4 |
| JD | Structures - Bridges/tunnels/buildings/retaining walls/sea defences (not bridge strikes) | 4 |
| JL | Safety related incident caused by maintenance or infrastructure staff oversight or error (not Operations staff) | 4 |
| Code | What Network Rail logged | Minutes |
|---|---|---|
| J3 | Axle Counter Failure | 1,976 |
| ID | Level crossing faults and failure incl. barrow/foot crossings and crossing treadles | 1,167 |
| JA | TSR speed restrictions for track work outside of the Timetable Planning Rules | 773 |
| IR | Broken/cracked/twisted/buckled/flawed rail | 730 |
| IC | Track circuit failure (including no fault found) | 665 |
| IA | Signal failure (including no fault found) | 640 |
| IV | Cutting or embankment earthslip, rock fall or subsidence (not the result of severe weather on the day of failure) | 404 |
| IK | Telecom equipment failure (including no fault found) | 389 |
| M7 | Door and Door system faults | 377 |
| X4 | Blanket speed restrictions or Key Route Strategy implemented with Group Standards or national operational safety instructions | 339 |