116 delay minutes

The biggest share (37%) of the delay picked up at Heyford in the four weeks to 9 December 2023 came from faulty trains.

45% of these minutes were knock-on from something that happened elsewhere first. 85% of them were agreed between Network Rail and the operators when the file came out on 5 Jan 2024, so they may still move.

By cause

Delay minutes by cause in 2023-24 P09
CauseMinutesShareNetwork-wideA day, against the same period other yearsTrains cancelled
Network Rail's causes
Track87%8% 0 a day, more than 1 of the other 4 years-
Signals, points and power2723%16% 1 a day, more than 2 of the other 4 years-
Weather and structures98%7% 0 a day, more than 3 of the other 4 years-
Autumn22%7% 0 a day, the least in 5 years-
External--4% 0 a day, the least in 5 years-
Network management1916%17% 1 a day, more than 2 of the other 4 years-
The operators' causes
Train faults4337%16% 2 a day, the most in 5 years-
Traincrew65%11% 0 a day, more than 1 of the other 4 years-
Stations--3% 0 a day, the least in 5 years-
Operations--5% 0 a day, the least in 5 years-
Operator, other22%7% 0 a day, the least in 5 years-

Period by period

Delay minutes a day, period by period. Gridlines every 10 minutes. Hatched periods were under 94% agreed when their file came out, so they may still move. Pick a bar to see that period.

The codes behind it

In 2023-24 P09
CodeWhat Network Rail loggedMinutes
M7Door and Door system faults35
IDLevel crossing faults and failure incl. barrow/foot crossings and crossing treadles19
I8Animal Strike or Incursion within the control of Network Rail6
IFTrain Describer/Panel/ARS/SSI/TDM Remote Control failure5
MDTechnical failures below the solebar5
X4Blanket speed restrictions or Key Route Strategy implemented with Group Standards or national operational safety instructions5
IRBroken/cracked/twisted/buckled/flawed rail4
ISTrack defects (other than rail defects) inc. fish plates, wet beds etc.4
JDStructures - Bridges/tunnels/buildings/retaining walls/sea defences (not bridge strikes)4
JLSafety related incident caused by maintenance or infrastructure staff oversight or error (not Operations staff)4
Since 2018
CodeWhat Network Rail loggedMinutes
J3Axle Counter Failure1,976
IDLevel crossing faults and failure incl. barrow/foot crossings and crossing treadles1,167
JATSR speed restrictions for track work outside of the Timetable Planning Rules773
IRBroken/cracked/twisted/buckled/flawed rail730
ICTrack circuit failure (including no fault found)665
IASignal failure (including no fault found)640
IVCutting or embankment earthslip, rock fall or subsidence (not the result of severe weather on the day of failure)404
IKTelecom equipment failure (including no fault found)389
M7Door and Door system faults377
X4Blanket speed restrictions or Key Route Strategy implemented with Group Standards or national operational safety instructions339