0 delay minutes
No delay was picked up at Hoylake in the four weeks to 9 December 2023.
100% of them were agreed between Network Rail and the operators when the file came out on 5 Jan 2024.
By cause
| Cause | Minutes | Share | Network-wide | Trains cancelled |
|---|---|---|---|---|
| Network Rail's causes | ||||
| Track | - | - | 8% | - |
| Signals, points and power | - | - | 16% | - |
| Weather and structures | - | - | 7% | 2 |
| Autumn | - | - | 7% | - |
| External | - | - | 4% | - |
| Network management | - | - | 17% | 10 |
| The operators' causes | ||||
| Train faults | - | - | 16% | - |
| Traincrew | - | - | 11% | - |
| Stations | - | - | 3% | - |
| Operations | - | - | 5% | - |
| Operator, other | - | - | 7% | - |
Quiet enough here (under 100 delay minutes a period on average) that comparing years would mostly be noise, so there's no comparison.
Period by period
The codes behind it
| Code | What Network Rail logged | Minutes |
|---|---|---|
| Nothing logged. | ||
| Code | What Network Rail logged | Minutes |
|---|---|---|
| R7 | Station delays as a result of overcrowding due to planned events (e.g. sports fixtures, concerts) | 77 |
| IS | Track defects (other than rail defects) inc. fish plates, wet beds etc. | 47 |
| OH | ARS / TMS / SARS software problem (excluding scheduling issues and technical failures) | 29 |
| J3 | Axle Counter Failure | 21 |
| MD | Technical failures below the solebar | 10 |
| Q1 | Takeback Pumps | 8 |
| J5 | Infrastructure Asset fault reported but proven to be mistaken | 6 |
| TG | Driver | 6 |
| XB | Vandalism or theft (including the placing of objects on the line) | 5 |
| X8 | Animal Strike or incursion not within the control of Network Rail | 4 |