Leaves on the Line

Hayes (Kent)

HYS Kent route
CSV JSON

1,261 delay minutes

The biggest share (25%) of the delay picked up at Hayes (Kent) in the four weeks to 9 December 2023 came from faulty trains.

83% of these minutes were knock-on from something that happened elsewhere first. 98% of them were agreed between Network Rail and the operators when the file came out on 5 Jan 2024.

By cause

Delay minutes by cause in 2023-24 P09
CauseMinutesShareNetwork-wideA day, against the same period other yearsTrains cancelled
Network Rail's causes
Track726%8% 3 a day, more than 3 of the other 4 years-
Signals, points and power494%16% 2 a day, the least in 5 years-
Weather and structures--7% 0 a day, the least in 5 years-
Autumn665%7% 2 a day, more than 1 of the other 4 years-
External17714%4% 6 a day, the most in 5 years3
Network management29323%17% 10 a day, more than 2 of the other 4 years1
The operators' causes
Train faults31125%16% 11 a day, more than 3 of the other 4 years14
Traincrew736%11% 3 a day, more than 1 of the other 4 years1
Stations1<1%3% 0 a day, more than 1 of the other 4 years-
Operations9<1%5% 0 a day, the least in 5 years1
Operator, other21017%7% 8 a day, more than 1 of the other 4 years1

Period by period

Delay minutes a day, period by period. Gridlines every 20 minutes. Hatched periods were under 94% agreed when their file came out, so they may still move. Pick a bar to see that period.

The codes behind it

In 2023-24 P09
CodeWhat Network Rail loggedMinutes
MNBrake and brake systems faults; including wheel flats where no other cause had been identified242
XPBRIDGE HIT177
I8Animal Strike or Incursion within the control of Network Rail169
VHPassenger Communication cord, door egress or emergency train alarm operated144
ISTrack defects (other than rail defects) inc. fish plates, wet beds etc.72
TGDriver70
Q3NZ Pumps T62
TTLeaf fall Neutral55
I6Delays as a result of line blocks / track patrols (including late handback)35
IKTelecom equipment failure (including no fault found)28
Since 2018
CodeWhat Network Rail loggedMinutes
ZSNo Cause ascertainable for a Sub-Threshold Delay causing Threshold Reactionary (where agreed by both parties)5,722
ICTrack circuit failure (including no fault found)4,965
TGDriver3,439
VHPassenger Communication cord, door egress or emergency train alarm operated3,330
IBPoints failure (including no fault found)3,249
IFTrain Describer/Panel/ARS/SSI/TDM Remote Control failure2,336
M7Door and Door system faults2,293
ISTrack defects (other than rail defects) inc. fish plates, wet beds etc.2,110
MNBrake and brake systems faults; including wheel flats where no other cause had been identified1,880
MDTechnical failures below the solebar1,607