1,482 delay minutes

The biggest share (20%) of the delay picked up at Ilford in the four weeks to 9 December 2023 came from how the network was run.

92% of these minutes were knock-on from something that happened elsewhere first. 91% of them were agreed between Network Rail and the operators when the file came out on 5 Jan 2024, so they may still move.

By cause

Delay minutes by cause in 2023-24 P09
CauseMinutesShareNetwork-wideA day, against the same period other yearsTrains cancelled
Network Rail's causes
Track292%8% 1 a day, the least in 5 years-
Signals, points and power936%16% 3 a day, the least in 5 years-
Weather and structures634%7% 2 a day, more than 3 of the other 4 years-
Autumn1017%7% 4 a day, more than 3 of the other 4 years-
External262%4% 1 a day, the most in 5 years-
Network management29520%17% 11 a day, more than 1 of the other 4 years-
The operators' causes
Train faults28019%16% 10 a day, the least in 5 years-
Traincrew785%11% 3 a day, more than 3 of the other 4 years-
Stations403%3% 1 a day, more than 2 of the other 4 years-
Operations25117%5% 9 a day, the most in 5 years-
Operator, other22715%7% 8 a day, the most in 5 years1

Period by period

Delay minutes a day, period by period. Gridlines every 50 minutes. Hatched periods were under 94% agreed when their file came out, so they may still move. Pick a bar to see that period.

The codes behind it

In 2023-24 P09
CodeWhat Network Rail loggedMinutes
TXDelays incurred on non-Network Rail running lines or networks including London Underground (except fleet related delays)188
MPRail / wheel interface, adhesion problems (including ice on the running rail)95
Q3NZ Pumps T95
M0Confirmed train cab based safety system fault (including GSMR)87
VHPassenger Communication cord, door egress or emergency train alarm operated75
MUDepot operating problem68
IVCutting or embankment earthslip, rock fall or subsidence (not the result of severe weather on the day of failure)63
M2Delay due to ATO / ETCS equipment55
TGDriver55
I1Overhead line/third rail defect50
Since 2018
CodeWhat Network Rail loggedMinutes
I6Delays as a result of line blocks / track patrols (including late handback)6,406
ISTrack defects (other than rail defects) inc. fish plates, wet beds etc.5,328
IFTrain Describer/Panel/ARS/SSI/TDM Remote Control failure3,655
IRBroken/cracked/twisted/buckled/flawed rail3,642
TGDriver3,292
IBPoints failure (including no fault found)3,278
MUDepot operating problem3,152
TXDelays incurred on non-Network Rail running lines or networks including London Underground (except fleet related delays)3,142
QMTrain schedule/STP Process including erroneous simplifiers3,113
M7Door and Door system faults2,897