Ilford
1,482 delay minutes
The biggest share (20%) of the delay picked up at Ilford in the four weeks to 9 December 2023 came from how the network was run.
92% of these minutes were knock-on from something that happened elsewhere first. 91% of them were agreed between Network Rail and the operators when the file came out on 5 Jan 2024, so they may still move.
By cause
| Cause | Minutes | Share | Network-wide | A day, against the same period other years | Trains cancelled |
|---|---|---|---|---|---|
| Network Rail's causes | |||||
| Track | 29 | 2% | 8% | 1 a day, the least in 5 years | - |
| Signals, points and power | 93 | 6% | 16% | 3 a day, the least in 5 years | - |
| Weather and structures | 63 | 4% | 7% | 2 a day, more than 3 of the other 4 years | - |
| Autumn | 101 | 7% | 7% | 4 a day, more than 3 of the other 4 years | - |
| External | 26 | 2% | 4% | 1 a day, the most in 5 years | - |
| Network management | 295 | 20% | 17% | 11 a day, more than 1 of the other 4 years | - |
| The operators' causes | |||||
| Train faults | 280 | 19% | 16% | 10 a day, the least in 5 years | - |
| Traincrew | 78 | 5% | 11% | 3 a day, more than 3 of the other 4 years | - |
| Stations | 40 | 3% | 3% | 1 a day, more than 2 of the other 4 years | - |
| Operations | 251 | 17% | 5% | 9 a day, the most in 5 years | - |
| Operator, other | 227 | 15% | 7% | 8 a day, the most in 5 years | 1 |
Period by period
The codes behind it
| Code | What Network Rail logged | Minutes |
|---|---|---|
| TX | Delays incurred on non-Network Rail running lines or networks including London Underground (except fleet related delays) | 188 |
| MP | Rail / wheel interface, adhesion problems (including ice on the running rail) | 95 |
| Q3 | NZ Pumps T | 95 |
| M0 | Confirmed train cab based safety system fault (including GSMR) | 87 |
| VH | Passenger Communication cord, door egress or emergency train alarm operated | 75 |
| MU | Depot operating problem | 68 |
| IV | Cutting or embankment earthslip, rock fall or subsidence (not the result of severe weather on the day of failure) | 63 |
| M2 | Delay due to ATO / ETCS equipment | 55 |
| TG | Driver | 55 |
| I1 | Overhead line/third rail defect | 50 |
| Code | What Network Rail logged | Minutes |
|---|---|---|
| I6 | Delays as a result of line blocks / track patrols (including late handback) | 6,406 |
| IS | Track defects (other than rail defects) inc. fish plates, wet beds etc. | 5,328 |
| IF | Train Describer/Panel/ARS/SSI/TDM Remote Control failure | 3,655 |
| IR | Broken/cracked/twisted/buckled/flawed rail | 3,642 |
| TG | Driver | 3,292 |
| IB | Points failure (including no fault found) | 3,278 |
| MU | Depot operating problem | 3,152 |
| TX | Delays incurred on non-Network Rail running lines or networks including London Underground (except fleet related delays) | 3,142 |
| QM | Train schedule/STP Process including erroneous simplifiers | 3,113 |
| M7 | Door and Door system faults | 2,897 |