Ilkley
2,628 delay minutes
The biggest share (17%) of the delay picked up at Ilkley in the four weeks to 9 December 2023 came from outside causes like vandalism, cable theft, animals and fires.
84% of these minutes were knock-on from something that happened elsewhere first. 96% of them were agreed between Network Rail and the operators when the file came out on 5 Jan 2024.
By cause
| Cause | Minutes | Share | Network-wide | A day, against the same period other years | Trains cancelled |
|---|---|---|---|---|---|
| Network Rail's causes | |||||
| Track | 326 | 12% | 8% | 12 a day, the most in 5 years | 3 |
| Signals, points and power | 128 | 5% | 16% | 5 a day, more than 3 of the other 4 years | 2 |
| Weather and structures | 279 | 11% | 7% | 10 a day, the most in 5 years | 5 |
| Autumn | 229 | 9% | 7% | 8 a day, more than 1 of the other 4 years | - |
| External | 449 | 17% | 4% | 16 a day, the most in 5 years | 10 |
| Network management | 213 | 8% | 17% | 8 a day, more than 3 of the other 4 years | 7 |
| The operators' causes | |||||
| Train faults | 298 | 11% | 16% | 11 a day, more than 2 of the other 4 years | 10 |
| Traincrew | 344 | 13% | 11% | 12 a day, the most in 5 years | 61 |
| Stations | 28 | 1% | 3% | 1 a day, more than 1 of the other 4 years | - |
| Operations | 48 | 2% | 5% | 2 a day, more than 3 of the other 4 years | 1 |
| Operator, other | 288 | 11% | 7% | 10 a day, more than 1 of the other 4 years | - |
Period by period
The codes behind it
| Code | What Network Rail logged | Minutes |
|---|---|---|
| XO | External trees, building or structures encroaching or falling onto network infrastructure (not weather or vandalism) | 348 |
| IR | Broken/cracked/twisted/buckled/flawed rail | 286 |
| TG | Driver | 208 |
| XW | Severe weather not snow affecting infrastructure the responsibility of Network Rail | 204 |
| Q3 | NZ Pumps T | 193 |
| TT | Leaf fall Neutral | 151 |
| MU | Depot operating problem | 117 |
| TH | (Senior) Conductor/Train Manager | 116 |
| XR | Cable vandalism or theft | 101 |
| MP | Rail / wheel interface, adhesion problems (including ice on the running rail) | 90 |
| Code | What Network Rail logged | Minutes |
|---|---|---|
| TG | Driver | 5,115 |
| MD | Technical failures below the solebar | 3,623 |
| Q3 | NZ Pumps T | 2,153 |
| MS | Planned underpowered or shortformed service and or vehicle, incl. exam set swaps | 2,116 |
| MN | Brake and brake systems faults; including wheel flats where no other cause had been identified | 2,111 |
| MU | Depot operating problem | 2,110 |
| TT | Leaf fall Neutral | 1,758 |
| T3 | Waiting connections from other transport modes | 1,644 |
| TH | (Senior) Conductor/Train Manager | 1,623 |
| M8 | Technical failures above the Solebar | 1,548 |