Ipswich
1,938 delay minutes
The biggest share (20%) of the delay picked up at Ipswich in the four weeks to 9 December 2023 came from faulty trains.
61% of these minutes were knock-on from something that happened elsewhere first. 99% of them were agreed between Network Rail and the operators when the file came out on 5 Jan 2024.
By cause
| Cause | Minutes | Share | Network-wide | A day, against the same period other years | Trains cancelled |
|---|---|---|---|---|---|
| Network Rail's causes | |||||
| Track | 58 | 3% | 8% | 2 a day, the least in 5 years | 2 |
| Signals, points and power | 229 | 12% | 16% | 8 a day, more than 1 of the other 4 years | - |
| Weather and structures | 177 | 9% | 7% | 6 a day, the most in 5 years | 1 |
| Autumn | 55 | 3% | 7% | 2 a day, more than 2 of the other 4 years | - |
| External | 171 | 9% | 4% | 6 a day, the most in 5 years | - |
| Network management | 300 | 15% | 17% | 11 a day, the least in 5 years | 9 |
| The operators' causes | |||||
| Train faults | 394 | 20% | 16% | 14 a day, more than 1 of the other 4 years | 5 |
| Traincrew | 199 | 10% | 11% | 7 a day, the most in 5 years | 2 |
| Stations | 3 | <1% | 3% | 0 a day, more than 1 of the other 4 years | - |
| Operations | 76 | 4% | 5% | 3 a day, the least in 5 years | - |
| Operator, other | 277 | 14% | 7% | 10 a day, more than 3 of the other 4 years | 2 |
Period by period
The codes behind it
| Code | What Network Rail logged | Minutes |
|---|---|---|
| IV | Cutting or embankment earthslip, rock fall or subsidence (not the result of severe weather on the day of failure) | 177 |
| TG | Driver | 142 |
| M7 | Door and Door system faults | 139 |
| VZ | Other passenger or external causes the responsibility of TOC | 103 |
| M0 | Confirmed train cab based safety system fault (including GSMR) | 94 |
| XK | National Grid Power Failure - local area also affected (inc outage, surges, blips where working standby generator/UPS installed) | 91 |
| JX | Miscellaneous items on track including litter (not including leaves, result of vandalism, weather or fallen/thrown from trains) | 76 |
| AC | Waiting Train preparation or completion of TOPS list/RT3973 | 74 |
| XN | Road or crossing related incidents inc. cars on line, crossing misuse and priority to emergency services (NOT bridge strikes) | 72 |
| MN | Brake and brake systems faults; including wheel flats where no other cause had been identified | 69 |
| Code | What Network Rail logged | Minutes |
|---|---|---|
| IS | Track defects (other than rail defects) inc. fish plates, wet beds etc. | 7,766 |
| OT | Ops Safety TSR implemented for sighting issues relating to foot crossings, level crossings or signals (Not vegetation caused) | 7,630 |
| MD | Technical failures below the solebar | 5,829 |
| MU | Depot operating problem | 4,810 |
| JL | Safety related incident caused by maintenance or infrastructure staff oversight or error (not Operations staff) | 4,544 |
| M8 | Technical failures above the Solebar | 4,234 |
| MC | Diesel Loco failure, defect, attention | 3,983 |
| IC | Track circuit failure (including no fault found) | 3,652 |
| M7 | Door and Door system faults | 3,010 |
| IF | Train Describer/Panel/ARS/SSI/TDM Remote Control failure | 2,988 |