Leaves on the Line

Ipswich

IPS Anglia route
CSV JSON

1,938 delay minutes

The biggest share (20%) of the delay picked up at Ipswich in the four weeks to 9 December 2023 came from faulty trains.

61% of these minutes were knock-on from something that happened elsewhere first. 99% of them were agreed between Network Rail and the operators when the file came out on 5 Jan 2024.

By cause

Delay minutes by cause in 2023-24 P09
CauseMinutesShareNetwork-wideA day, against the same period other yearsTrains cancelled
Network Rail's causes
Track583%8% 2 a day, the least in 5 years2
Signals, points and power22912%16% 8 a day, more than 1 of the other 4 years-
Weather and structures1779%7% 6 a day, the most in 5 years1
Autumn553%7% 2 a day, more than 2 of the other 4 years-
External1719%4% 6 a day, the most in 5 years-
Network management30015%17% 11 a day, the least in 5 years9
The operators' causes
Train faults39420%16% 14 a day, more than 1 of the other 4 years5
Traincrew19910%11% 7 a day, the most in 5 years2
Stations3<1%3% 0 a day, more than 1 of the other 4 years-
Operations764%5% 3 a day, the least in 5 years-
Operator, other27714%7% 10 a day, more than 3 of the other 4 years2

Period by period

Delay minutes a day, period by period. Gridlines every 50 minutes. Hatched periods were under 94% agreed when their file came out, so they may still move. Pick a bar to see that period.

The codes behind it

In 2023-24 P09
CodeWhat Network Rail loggedMinutes
IVCutting or embankment earthslip, rock fall or subsidence (not the result of severe weather on the day of failure)177
TGDriver142
M7Door and Door system faults139
VZOther passenger or external causes the responsibility of TOC103
M0Confirmed train cab based safety system fault (including GSMR)94
XKNational Grid Power Failure - local area also affected (inc outage, surges, blips where working standby generator/UPS installed)91
JXMiscellaneous items on track including litter (not including leaves, result of vandalism, weather or fallen/thrown from trains)76
ACWaiting Train preparation or completion of TOPS list/RT397374
XNRoad or crossing related incidents inc. cars on line, crossing misuse and priority to emergency services (NOT bridge strikes)72
MNBrake and brake systems faults; including wheel flats where no other cause had been identified69
Since 2018
CodeWhat Network Rail loggedMinutes
ISTrack defects (other than rail defects) inc. fish plates, wet beds etc.7,766
OTOps Safety TSR implemented for sighting issues relating to foot crossings, level crossings or signals (Not vegetation caused)7,630
MDTechnical failures below the solebar5,829
MUDepot operating problem4,810
JLSafety related incident caused by maintenance or infrastructure staff oversight or error (not Operations staff)4,544
M8Technical failures above the Solebar4,234
MCDiesel Loco failure, defect, attention3,983
ICTrack circuit failure (including no fault found)3,652
M7Door and Door system faults3,010
IFTrain Describer/Panel/ARS/SSI/TDM Remote Control failure2,988