Leaves on the Line

Irlam

IRL North West route
CSV JSON

31 delay minutes

Most of the delay picked up at Irlam in the four weeks to 9 December 2023 came from signal, points and power faults.

0% of these minutes were knock-on from something that happened elsewhere first. 100% of them were agreed between Network Rail and the operators when the file came out on 5 Jan 2024.

By cause

Delay minutes by cause in 2023-24 P09
CauseMinutesShareNetwork-wideTrains cancelled
Network Rail's causes
Track--8%-
Signals, points and power31100%16%1
Weather and structures--7%-
Autumn--7%-
External--4%-
Network management--17%-
The operators' causes
Train faults--16%-
Traincrew--11%-
Stations--3%-
Operations--5%-
Operator, other--7%-

Quiet enough here (under 100 delay minutes a period on average) that comparing years would mostly be noise, so there's no comparison.

Period by period

Delay minutes a day, period by period. Gridlines every 1 minutes. Hatched periods were under 94% agreed when their file came out, so they may still move. Pick a bar to see that period.

The codes behind it

In 2023-24 P09
CodeWhat Network Rail loggedMinutes
IBPoints failure (including no fault found)31
Since 2018
CodeWhat Network Rail loggedMinutes
IBPoints failure (including no fault found)31
ISTrack defects (other than rail defects) inc. fish plates, wet beds etc.9
TGDriver8
JBReactionary Delay to 'P' coded TSRs3
JHCritical Rail Temperature speeds, (other than buckled rails)3
MNBrake and brake systems faults; including wheel flats where no other cause had been identified3
JXMiscellaneous items on track including litter (not including leaves, result of vandalism, weather or fallen/thrown from trains)3
IFTrain Describer/Panel/ARS/SSI/TDM Remote Control failure3