Kidsgrove
1,426 delay minutes
The biggest share (18%) of the delay picked up at Kidsgrove in the four weeks to 9 December 2023 came from other operator causes.
72% of these minutes were knock-on from something that happened elsewhere first. 92% of them were agreed between Network Rail and the operators when the file came out on 5 Jan 2024, so they may still move.
By cause
| Cause | Minutes | Share | Network-wide | A day, against the same period other years | Trains cancelled |
|---|---|---|---|---|---|
| Network Rail's causes | |||||
| Track | 15 | 1% | 8% | 1 a day, the least in 5 years | - |
| Signals, points and power | 135 | 9% | 16% | 5 a day, more than 2 of the other 4 years | - |
| Weather and structures | 148 | 10% | 7% | 5 a day, more than 2 of the other 4 years | - |
| Autumn | 120 | 8% | 7% | 4 a day, the most in 5 years | - |
| External | 44 | 3% | 4% | 2 a day, more than 3 of the other 4 years | - |
| Network management | 254 | 18% | 17% | 9 a day, more than 3 of the other 4 years | - |
| The operators' causes | |||||
| Train faults | 214 | 15% | 16% | 8 a day, more than 1 of the other 4 years | - |
| Traincrew | 113 | 8% | 11% | 4 a day, more than 3 of the other 4 years | - |
| Stations | 67 | 5% | 3% | 2 a day, more than 2 of the other 4 years | - |
| Operations | 54 | 4% | 5% | 2 a day, more than 3 of the other 4 years | - |
| Operator, other | 264 | 18% | 7% | 9 a day, the most in 5 years | - |
Period by period
The codes behind it
| Code | What Network Rail logged | Minutes |
|---|---|---|
| JK | Flooding not due to exceptional weather | 91 |
| Q3 | NZ Pumps T | 86 |
| V8 | Train striking or being struck by a bird | 78 |
| TG | Driver | 76 |
| TT | Leaf fall Neutral | 65 |
| IH | Power Supply And Distribution System Failure | 53 |
| MN | Brake and brake systems faults; including wheel flats where no other cause had been identified | 48 |
| MP | Rail / wheel interface, adhesion problems (including ice on the running rail) | 44 |
| M8 | Technical failures above the Solebar | 43 |
| XL | Fire external to but directly affecting the network (incl. line blocks for emergency services attending off network incidents) | 39 |
| Code | What Network Rail logged | Minutes |
|---|---|---|
| JP | Failure to maintain vegetation within network boundaries in accordance with prevailing Network Rail standards | 2,431 |
| TG | Driver | 2,426 |
| ZS | No Cause ascertainable for a Sub-Threshold Delay causing Threshold Reactionary (where agreed by both parties) | 2,283 |
| IF | Train Describer/Panel/ARS/SSI/TDM Remote Control failure | 2,238 |
| MD | Technical failures below the solebar | 2,211 |
| M8 | Technical failures above the Solebar | 2,162 |
| I1 | Overhead line/third rail defect | 2,000 |
| ZU | No Cause Identified After investigation by both Parties | 2,000 |
| IR | Broken/cracked/twisted/buckled/flawed rail | 1,783 |
| IB | Points failure (including no fault found) | 1,769 |