Keighley
1,985 delay minutes
The biggest share (15%) of the delay picked up at Keighley in the four weeks to 9 December 2023 came from signal, points and power faults.
57% of these minutes were knock-on from something that happened elsewhere first. 99% of them were agreed between Network Rail and the operators when the file came out on 5 Jan 2024.
By cause
| Cause | Minutes | Share | Network-wide | A day, against the same period other years | Trains cancelled |
|---|---|---|---|---|---|
| Network Rail's causes | |||||
| Track | 268 | 14% | 8% | 10 a day, the most in 5 years | 7 |
| Signals, points and power | 300 | 15% | 16% | 11 a day, the most in 5 years | - |
| Weather and structures | 230 | 12% | 7% | 8 a day, the most in 5 years | - |
| Autumn | 277 | 14% | 7% | 10 a day, more than 1 of the other 4 years | - |
| External | 76 | 4% | 4% | 3 a day, more than 2 of the other 4 years | - |
| Network management | 140 | 7% | 17% | 5 a day, more than 2 of the other 4 years | - |
| The operators' causes | |||||
| Train faults | 174 | 9% | 16% | 6 a day, more than 2 of the other 4 years | - |
| Traincrew | 200 | 10% | 11% | 7 a day, more than 3 of the other 4 years | - |
| Stations | 19 | <1% | 3% | 1 a day, the least in 5 years | - |
| Operations | 11 | <1% | 5% | 0 a day, the least in 5 years | - |
| Operator, other | 292 | 15% | 7% | 10 a day, more than 1 of the other 4 years | - |
Period by period
The codes behind it
| Code | What Network Rail logged | Minutes |
|---|---|---|
| Q3 | NZ Pumps T | 256 |
| TT | Leaf fall Neutral | 247 |
| IR | Broken/cracked/twisted/buckled/flawed rail | 241 |
| IF | Train Describer/Panel/ARS/SSI/TDM Remote Control failure | 227 |
| TG | Driver | 118 |
| XW | Severe weather not snow affecting infrastructure the responsibility of Network Rail | 77 |
| X4 | Blanket speed restrictions or Key Route Strategy implemented with Group Standards or national operational safety instructions | 74 |
| TH | (Senior) Conductor/Train Manager | 69 |
| XO | External trees, building or structures encroaching or falling onto network infrastructure (not weather or vandalism) | 67 |
| OU | Delays not Investigated by Network Rail | 54 |
| Code | What Network Rail logged | Minutes |
|---|---|---|
| MD | Technical failures below the solebar | 3,789 |
| Q3 | NZ Pumps T | 3,097 |
| RC | re-booked assistance for a person with reduced mobility joining/alighting, | 2,898 |
| TG | Driver | 2,891 |
| MN | Brake and brake systems faults; including wheel flats where no other cause had been identified | 2,752 |
| TT | Leaf fall Neutral | 2,707 |
| ZS | No Cause ascertainable for a Sub-Threshold Delay causing Threshold Reactionary (where agreed by both parties) | 1,825 |
| MS | Planned underpowered or shortformed service and or vehicle, incl. exam set swaps | 1,543 |
| RB | Passengers joining/alighting | 1,528 |
| M7 | Door and Door system faults | 1,438 |