Kemble
687 delay minutes
Most of the delay picked up at Kemble in the four weeks to 9 December 2023 came from signal, points and power faults.
28% of these minutes were knock-on from something that happened elsewhere first. 99% of them were agreed between Network Rail and the operators when the file came out on 5 Jan 2024.
By cause
| Cause | Minutes | Share | Network-wide | A day, against the same period other years | Trains cancelled |
|---|---|---|---|---|---|
| Network Rail's causes | |||||
| Track | 52 | 8% | 8% | 2 a day, the most in 5 years | - |
| Signals, points and power | 373 | 54% | 16% | 13 a day, the most in 5 years | - |
| Weather and structures | 15 | 2% | 7% | 1 a day, more than 3 of the other 4 years | - |
| Autumn | 23 | 3% | 7% | 1 a day, more than 3 of the other 4 years | - |
| External | 21 | 3% | 4% | 1 a day, more than 3 of the other 4 years | - |
| Network management | 102 | 15% | 17% | 4 a day, more than 3 of the other 4 years | - |
| The operators' causes | |||||
| Train faults | 34 | 5% | 16% | 1 a day, more than 3 of the other 4 years | - |
| Traincrew | 19 | 3% | 11% | 1 a day, more than 3 of the other 4 years | - |
| Stations | 18 | 3% | 3% | 1 a day, more than 2 of the other 4 years | - |
| Operations | 3 | <1% | 5% | 0 a day, more than 2 of the other 4 years | - |
| Operator, other | 27 | 4% | 7% | 1 a day, more than 3 of the other 4 years | - |
Period by period
The codes behind it
| Code | What Network Rail logged | Minutes |
|---|---|---|
| IC | Track circuit failure (including no fault found) | 198 |
| IB | Points failure (including no fault found) | 108 |
| ID | Level crossing faults and failure incl. barrow/foot crossings and crossing treadles | 58 |
| JP | Failure to maintain vegetation within network boundaries in accordance with prevailing Network Rail standards | 41 |
| IS | Track defects (other than rail defects) inc. fish plates, wet beds etc. | 40 |
| OU | Delays not Investigated by Network Rail | 23 |
| Q3 | NZ Pumps T | 20 |
| TT | Leaf fall Neutral | 20 |
| TG | Driver | 19 |
| XN | Road or crossing related incidents inc. cars on line, crossing misuse and priority to emergency services (NOT bridge strikes) | 17 |
| Code | What Network Rail logged | Minutes |
|---|---|---|
| IB | Points failure (including no fault found) | 1,249 |
| IF | Train Describer/Panel/ARS/SSI/TDM Remote Control failure | 1,096 |
| MD | Technical failures below the solebar | 878 |
| TG | Driver | 805 |
| IC | Track circuit failure (including no fault found) | 746 |
| ZU | No Cause Identified After investigation by both Parties | 682 |
| OC | Signaller including mis-routing (not ERTM /ETCS related) | 619 |
| X4 | Blanket speed restrictions or Key Route Strategy implemented with Group Standards or national operational safety instructions | 563 |
| RB | Passengers joining/alighting | 555 |
| M8 | Technical failures above the Solebar | 542 |