1,117 delay minutes

The biggest share (27%) of the delay picked up at Kettering in the four weeks to 9 December 2023 came from how the network was run.

51% of these minutes were knock-on from something that happened elsewhere first. 81% of them were agreed between Network Rail and the operators when the file came out on 5 Jan 2024, so they may still move.

By cause

Delay minutes by cause in 2023-24 P09
CauseMinutesShareNetwork-wideA day, against the same period other yearsTrains cancelled
Network Rail's causes
Track535%8% 2 a day, more than 3 of the other 4 years-
Signals, points and power17015%16% 6 a day, more than 2 of the other 4 years-
Weather and structures615%7% 2 a day, more than 2 of the other 4 years1
Autumn161%7% 1 a day, more than 3 of the other 4 years-
External--4% 0 a day, the least in 5 years-
Network management29727%17% 11 a day, the most in 5 years7
The operators' causes
Train faults21719%16% 8 a day, more than 3 of the other 4 years7
Traincrew21820%11% 8 a day, the most in 5 years8
Stations383%3% 1 a day, more than 2 of the other 4 years-
Operations202%5% 1 a day, more than 3 of the other 4 years-
Operator, other283%7% 1 a day, more than 1 of the other 4 years-

Period by period

Delay minutes a day, period by period. Gridlines every 20 minutes. Hatched periods were under 94% agreed when their file came out, so they may still move. Pick a bar to see that period.

The codes behind it

In 2023-24 P09
CodeWhat Network Rail loggedMinutes
IESignalling Functional Power Supply Failure148
TGDriver137
I5Possession over-run from planned work130
M8Technical failures above the Solebar88
TITraincrew rostering problem74
ISTrack defects (other than rail defects) inc. fish plates, wet beds etc.37
M7Door and Door system faults34
MNBrake and brake systems faults; including wheel flats where no other cause had been identified33
MTConfirmed train borne safety system faults (not cab based)33
OCSignaller including mis-routing (not ERTM /ETCS related)32
Since 2018
CodeWhat Network Rail loggedMinutes
TGDriver3,341
M8Technical failures above the Solebar3,128
MDTechnical failures below the solebar2,175
ISTrack defects (other than rail defects) inc. fish plates, wet beds etc.1,951
IVCutting or embankment earthslip, rock fall or subsidence (not the result of severe weather on the day of failure)1,569
ICTrack circuit failure (including no fault found)1,479
M7Door and Door system faults1,412
I5Possession over-run from planned work1,343
XRCable vandalism or theft1,281
IBPoints failure (including no fault found)1,238