Kidderminster
1,120 delay minutes
The biggest share (28%) of the delay picked up at Kidderminster in the four weeks to 9 December 2023 came from signal, points and power faults.
59% of these minutes were knock-on from something that happened elsewhere first. 100% of them were agreed between Network Rail and the operators when the file came out on 5 Jan 2024.
By cause
| Cause | Minutes | Share | Network-wide | A day, against the same period other years | Trains cancelled |
|---|---|---|---|---|---|
| Network Rail's causes | |||||
| Track | 27 | 2% | 8% | 1 a day, more than 1 of the other 4 years | - |
| Signals, points and power | 314 | 28% | 16% | 11 a day, the most in 5 years | 3 |
| Weather and structures | - | - | 7% | 0 a day, the least in 5 years | - |
| Autumn | 75 | 7% | 7% | 3 a day, more than 2 of the other 4 years | - |
| External | 88 | 8% | 4% | 3 a day, the most in 5 years | 1 |
| Network management | 96 | 9% | 17% | 3 a day, the least in 5 years | 41 |
| The operators' causes | |||||
| Train faults | 147 | 13% | 16% | 5 a day, the least in 5 years | 4 |
| Traincrew | 278 | 25% | 11% | 10 a day, more than 1 of the other 4 years | 51 |
| Stations | 16 | 1% | 3% | 1 a day, the least in 5 years | - |
| Operations | 4 | <1% | 5% | 0 a day, more than 1 of the other 4 years | - |
| Operator, other | 75 | 7% | 7% | 3 a day, the least in 5 years | 2 |
Period by period
The codes behind it
| Code | What Network Rail logged | Minutes |
|---|---|---|
| TG | Driver | 259 |
| IB | Points failure (including no fault found) | 246 |
| XP | BRIDGE HIT | 77 |
| JP | Failure to maintain vegetation within network boundaries in accordance with prevailing Network Rail standards | 51 |
| M8 | Technical failures above the Solebar | 50 |
| Q3 | NZ Pumps T | 43 |
| M7 | Door and Door system faults | 38 |
| TT | Leaf fall Neutral | 35 |
| IF | Train Describer/Panel/ARS/SSI/TDM Remote Control failure | 30 |
| IS | Track defects (other than rail defects) inc. fish plates, wet beds etc. | 27 |
| Code | What Network Rail logged | Minutes |
|---|---|---|
| TG | Driver | 8,832 |
| JA | TSR speed restrictions for track work outside of the Timetable Planning Rules | 6,369 |
| ZU | No Cause Identified After investigation by both Parties | 4,550 |
| MD | Technical failures below the solebar | 4,395 |
| ZS | No Cause ascertainable for a Sub-Threshold Delay causing Threshold Reactionary (where agreed by both parties) | 3,815 |
| IF | Train Describer/Panel/ARS/SSI/TDM Remote Control failure | 3,205 |
| TH | (Senior) Conductor/Train Manager | 3,183 |
| IC | Track circuit failure (including no fault found) | 2,545 |
| IA | Signal failure (including no fault found) | 1,901 |
| RQ | Un-booked assistance for a person with reduced mobility joining/alighting, | 1,611 |