Leaves on the Line

Kidderminster

KID Central route
CSV JSON

1,120 delay minutes

The biggest share (28%) of the delay picked up at Kidderminster in the four weeks to 9 December 2023 came from signal, points and power faults.

59% of these minutes were knock-on from something that happened elsewhere first. 100% of them were agreed between Network Rail and the operators when the file came out on 5 Jan 2024.

By cause

Delay minutes by cause in 2023-24 P09
CauseMinutesShareNetwork-wideA day, against the same period other yearsTrains cancelled
Network Rail's causes
Track272%8% 1 a day, more than 1 of the other 4 years-
Signals, points and power31428%16% 11 a day, the most in 5 years3
Weather and structures--7% 0 a day, the least in 5 years-
Autumn757%7% 3 a day, more than 2 of the other 4 years-
External888%4% 3 a day, the most in 5 years1
Network management969%17% 3 a day, the least in 5 years41
The operators' causes
Train faults14713%16% 5 a day, the least in 5 years4
Traincrew27825%11% 10 a day, more than 1 of the other 4 years51
Stations161%3% 1 a day, the least in 5 years-
Operations4<1%5% 0 a day, more than 1 of the other 4 years-
Operator, other757%7% 3 a day, the least in 5 years2

Period by period

Delay minutes a day, period by period. Gridlines every 20 minutes. Hatched periods were under 94% agreed when their file came out, so they may still move. Pick a bar to see that period.

The codes behind it

In 2023-24 P09
CodeWhat Network Rail loggedMinutes
TGDriver259
IBPoints failure (including no fault found)246
XPBRIDGE HIT77
JPFailure to maintain vegetation within network boundaries in accordance with prevailing Network Rail standards51
M8Technical failures above the Solebar50
Q3NZ Pumps T43
M7Door and Door system faults38
TTLeaf fall Neutral35
IFTrain Describer/Panel/ARS/SSI/TDM Remote Control failure30
ISTrack defects (other than rail defects) inc. fish plates, wet beds etc.27
Since 2018
CodeWhat Network Rail loggedMinutes
TGDriver8,832
JATSR speed restrictions for track work outside of the Timetable Planning Rules6,369
ZUNo Cause Identified After investigation by both Parties4,550
MDTechnical failures below the solebar4,395
ZSNo Cause ascertainable for a Sub-Threshold Delay causing Threshold Reactionary (where agreed by both parties)3,815
IFTrain Describer/Panel/ARS/SSI/TDM Remote Control failure3,205
TH(Senior) Conductor/Train Manager3,183
ICTrack circuit failure (including no fault found)2,545
IASignal failure (including no fault found)1,901
RQUn-booked assistance for a person with reduced mobility joining/alighting,1,611