Knaresborough

KNA North & East route
CSV JSON

1,045 delay minutes

The biggest share (19%) of the delay picked up at Knaresborough in the four weeks to 9 December 2023 came from other operator causes.

53% of these minutes were knock-on from something that happened elsewhere first. 89% of them were agreed between Network Rail and the operators when the file came out on 5 Jan 2024, so they may still move.

By cause

Delay minutes by cause in 2023-24 P09
CauseMinutesShareNetwork-wideA day, against the same period other yearsTrains cancelled
Network Rail's causes
Track707%8% 3 a day, the most in 5 years-
Signals, points and power10710%16% 4 a day, more than 3 of the other 4 years-
Weather and structures10610%7% 4 a day, the most in 5 years2
Autumn17116%7% 6 a day, more than 2 of the other 4 years-
External3<1%4% 0 a day, more than 1 of the other 4 years-
Network management12912%17% 5 a day, the most in 5 years9
The operators' causes
Train faults14714%16% 5 a day, more than 3 of the other 4 years1
Traincrew525%11% 2 a day, more than 2 of the other 4 years3
Stations192%3% 1 a day, more than 1 of the other 4 years-
Operations474%5% 2 a day, more than 3 of the other 4 years1
Operator, other19419%7% 7 a day, more than 3 of the other 4 years-

Period by period

Delay minutes a day, period by period. Gridlines every 10 minutes. Hatched periods were under 94% agreed when their file came out, so they may still move. Pick a bar to see that period.

The codes behind it

In 2023-24 P09
CodeWhat Network Rail loggedMinutes
Q3NZ Pumps T163
TTLeaf fall Neutral156
M8Technical failures above the Solebar88
ISTrack defects (other than rail defects) inc. fish plates, wet beds etc.70
OUDelays not Investigated by Network Rail53
TGDriver49
JTPoints failure caused by snow or frost where heaters are not fitted38
OCSignaller including mis-routing (not ERTM /ETCS related)38
X2Severe flooding beyond that which could be mitigated on Network Rail infrastructure37
IFTrain Describer/Panel/ARS/SSI/TDM Remote Control failure34
Since 2018
CodeWhat Network Rail loggedMinutes
MDTechnical failures below the solebar1,641
OCSignaller including mis-routing (not ERTM /ETCS related)1,487
Q3NZ Pumps T1,430
TGDriver1,404
IASignal failure (including no fault found)1,141
TTLeaf fall Neutral1,084
IFTrain Describer/Panel/ARS/SSI/TDM Remote Control failure997
RCre-booked assistance for a person with reduced mobility joining/alighting,800
M8Technical failures above the Solebar774
IGBlock failure772