Knaresborough
1,045 delay minutes
The biggest share (19%) of the delay picked up at Knaresborough in the four weeks to 9 December 2023 came from other operator causes.
53% of these minutes were knock-on from something that happened elsewhere first. 89% of them were agreed between Network Rail and the operators when the file came out on 5 Jan 2024, so they may still move.
By cause
| Cause | Minutes | Share | Network-wide | A day, against the same period other years | Trains cancelled |
|---|---|---|---|---|---|
| Network Rail's causes | |||||
| Track | 70 | 7% | 8% | 3 a day, the most in 5 years | - |
| Signals, points and power | 107 | 10% | 16% | 4 a day, more than 3 of the other 4 years | - |
| Weather and structures | 106 | 10% | 7% | 4 a day, the most in 5 years | 2 |
| Autumn | 171 | 16% | 7% | 6 a day, more than 2 of the other 4 years | - |
| External | 3 | <1% | 4% | 0 a day, more than 1 of the other 4 years | - |
| Network management | 129 | 12% | 17% | 5 a day, the most in 5 years | 9 |
| The operators' causes | |||||
| Train faults | 147 | 14% | 16% | 5 a day, more than 3 of the other 4 years | 1 |
| Traincrew | 52 | 5% | 11% | 2 a day, more than 2 of the other 4 years | 3 |
| Stations | 19 | 2% | 3% | 1 a day, more than 1 of the other 4 years | - |
| Operations | 47 | 4% | 5% | 2 a day, more than 3 of the other 4 years | 1 |
| Operator, other | 194 | 19% | 7% | 7 a day, more than 3 of the other 4 years | - |
Period by period
The codes behind it
| Code | What Network Rail logged | Minutes |
|---|---|---|
| Q3 | NZ Pumps T | 163 |
| TT | Leaf fall Neutral | 156 |
| M8 | Technical failures above the Solebar | 88 |
| IS | Track defects (other than rail defects) inc. fish plates, wet beds etc. | 70 |
| OU | Delays not Investigated by Network Rail | 53 |
| TG | Driver | 49 |
| JT | Points failure caused by snow or frost where heaters are not fitted | 38 |
| OC | Signaller including mis-routing (not ERTM /ETCS related) | 38 |
| X2 | Severe flooding beyond that which could be mitigated on Network Rail infrastructure | 37 |
| IF | Train Describer/Panel/ARS/SSI/TDM Remote Control failure | 34 |
| Code | What Network Rail logged | Minutes |
|---|---|---|
| MD | Technical failures below the solebar | 1,641 |
| OC | Signaller including mis-routing (not ERTM /ETCS related) | 1,487 |
| Q3 | NZ Pumps T | 1,430 |
| TG | Driver | 1,404 |
| IA | Signal failure (including no fault found) | 1,141 |
| TT | Leaf fall Neutral | 1,084 |
| IF | Train Describer/Panel/ARS/SSI/TDM Remote Control failure | 997 |
| RC | re-booked assistance for a person with reduced mobility joining/alighting, | 800 |
| M8 | Technical failures above the Solebar | 774 |
| IG | Block failure | 772 |