Leaves on the Line

Kings Norton

KNN Central route
CSV JSON

1,271 delay minutes

The biggest share (39%) of the delay picked up at Kings Norton in the four weeks to 9 December 2023 came from signal, points and power faults.

66% of these minutes were knock-on from something that happened elsewhere first. 98% of them were agreed between Network Rail and the operators when the file came out on 5 Jan 2024.

By cause

Delay minutes by cause in 2023-24 P09
CauseMinutesShareNetwork-wideA day, against the same period other yearsTrains cancelled
Network Rail's causes
Track353%8% 1 a day, more than 2 of the other 4 years-
Signals, points and power49339%16% 18 a day, more than 3 of the other 4 years-
Weather and structures504%7% 2 a day, more than 2 of the other 4 years-
Autumn403%7% 1 a day, more than 2 of the other 4 years-
External927%4% 3 a day, the most in 5 years-
Network management17214%17% 6 a day, more than 1 of the other 4 years-
The operators' causes
Train faults1099%16% 4 a day, the least in 5 years-
Traincrew544%11% 2 a day, more than 1 of the other 4 years-
Stations12710%3% 5 a day, more than 3 of the other 4 years-
Operations242%5% 1 a day, more than 2 of the other 4 years-
Operator, other756%7% 3 a day, more than 2 of the other 4 years-

Period by period

Delay minutes a day, period by period. Gridlines every 50 minutes. Hatched periods were under 94% agreed when their file came out, so they may still move. Pick a bar to see that period.

The codes behind it

In 2023-24 P09
CodeWhat Network Rail loggedMinutes
IFTrain Describer/Panel/ARS/SSI/TDM Remote Control failure228
IBPoints failure (including no fault found)149
RQUn-booked assistance for a person with reduced mobility joining/alighting,104
XOExternal trees, building or structures encroaching or falling onto network infrastructure (not weather or vandalism)89
IASignal failure (including no fault found)52
MNBrake and brake systems faults; including wheel flats where no other cause had been identified40
ZSNo Cause ascertainable for a Sub-Threshold Delay causing Threshold Reactionary (where agreed by both parties)37
Q3NZ Pumps T32
TGDriver32
VHPassenger Communication cord, door egress or emergency train alarm operated26
Since 2018
CodeWhat Network Rail loggedMinutes
IJAWS/ATP/TPWS/Train stop/On track equipment failure5,240
TGDriver4,612
ZSNo Cause ascertainable for a Sub-Threshold Delay causing Threshold Reactionary (where agreed by both parties)4,111
IBPoints failure (including no fault found)3,534
MDTechnical failures below the solebar3,272
ZUNo Cause Identified After investigation by both Parties3,227
ISTrack defects (other than rail defects) inc. fish plates, wet beds etc.2,792
RQUn-booked assistance for a person with reduced mobility joining/alighting,2,580
TH(Senior) Conductor/Train Manager2,563
M8Technical failures above the Solebar2,307