Knottingley
1,620 delay minutes
The biggest share (22%) of the delay picked up at Knottingley in the four weeks to 9 December 2023 came from weather and structures.
91% of these minutes were knock-on from something that happened elsewhere first. 90% of them were agreed between Network Rail and the operators when the file came out on 5 Jan 2024, so they may still move.
By cause
| Cause | Minutes | Share | Network-wide | A day, against the same period other years | Trains cancelled |
|---|---|---|---|---|---|
| Network Rail's causes | |||||
| Track | 112 | 7% | 8% | 4 a day, the most in 5 years | 1 |
| Signals, points and power | 141 | 9% | 16% | 5 a day, more than 3 of the other 4 years | 1 |
| Weather and structures | 363 | 22% | 7% | 13 a day, the most in 5 years | 8 |
| Autumn | 73 | 4% | 7% | 3 a day, more than 1 of the other 4 years | - |
| External | 160 | 10% | 4% | 6 a day, the most in 5 years | 4 |
| Network management | 269 | 17% | 17% | 10 a day, more than 3 of the other 4 years | 47 |
| The operators' causes | |||||
| Train faults | 235 | 15% | 16% | 8 a day, more than 2 of the other 4 years | 13 |
| Traincrew | 116 | 7% | 11% | 4 a day, more than 3 of the other 4 years | 24 |
| Stations | 64 | 4% | 3% | 2 a day, the most in 5 years | - |
| Operations | 34 | 2% | 5% | 1 a day, more than 1 of the other 4 years | - |
| Operator, other | 55 | 3% | 7% | 2 a day, the least in 5 years | - |
Period by period
The codes behind it
| Code | What Network Rail logged | Minutes |
|---|---|---|
| XW | Severe weather not snow affecting infrastructure the responsibility of Network Rail | 347 |
| XO | External trees, building or structures encroaching or falling onto network infrastructure (not weather or vandalism) | 154 |
| OU | Delays not Investigated by Network Rail | 134 |
| OC | Signaller including mis-routing (not ERTM /ETCS related) | 94 |
| IH | Power Supply And Distribution System Failure | 90 |
| MD | Technical failures below the solebar | 82 |
| TG | Driver | 73 |
| IR | Broken/cracked/twisted/buckled/flawed rail | 72 |
| MN | Brake and brake systems faults; including wheel flats where no other cause had been identified | 63 |
| Q3 | NZ Pumps T | 46 |
| Code | What Network Rail logged | Minutes |
|---|---|---|
| MD | Technical failures below the solebar | 2,398 |
| MS | Planned underpowered or shortformed service and or vehicle, incl. exam set swaps | 2,193 |
| TG | Driver | 2,018 |
| M7 | Door and Door system faults | 1,032 |
| XW | Severe weather not snow affecting infrastructure the responsibility of Network Rail | 997 |
| TH | (Senior) Conductor/Train Manager | 953 |
| IS | Track defects (other than rail defects) inc. fish plates, wet beds etc. | 950 |
| IB | Points failure (including no fault found) | 940 |
| IC | Track circuit failure (including no fault found) | 772 |
| M8 | Technical failures above the Solebar | 722 |