13 delay minutes
Most of the delay picked up at Kensal Rise in the four weeks to 9 December 2023 came from signal, points and power faults.
23% of these minutes were knock-on from something that happened elsewhere first. 100% of them were agreed between Network Rail and the operators when the file came out on 5 Jan 2024.
By cause
| Cause | Minutes | Share | Network-wide | Trains cancelled |
|---|---|---|---|---|
| Network Rail's causes | ||||
| Track | 5 | 38% | 8% | - |
| Signals, points and power | 8 | 62% | 16% | 2 |
| Weather and structures | - | - | 7% | - |
| Autumn | - | - | 7% | - |
| External | - | - | 4% | 2 |
| Network management | - | - | 17% | - |
| The operators' causes | ||||
| Train faults | - | - | 16% | 1 |
| Traincrew | - | - | 11% | 1 |
| Stations | - | - | 3% | - |
| Operations | - | - | 5% | - |
| Operator, other | - | - | 7% | - |
Quiet enough here (under 100 delay minutes a period on average) that comparing years would mostly be noise, so there's no comparison.
Period by period
The codes behind it
| Code | What Network Rail logged | Minutes |
|---|---|---|
| IB | Points failure (including no fault found) | 5 |
| IR | Broken/cracked/twisted/buckled/flawed rail | 5 |
| IA | Signal failure (including no fault found) | 3 |
| Code | What Network Rail logged | Minutes |
|---|---|---|
| IB | Points failure (including no fault found) | 56 |
| TG | Driver | 56 |
| JP | Failure to maintain vegetation within network boundaries in accordance with prevailing Network Rail standards | 25 |
| MN | Brake and brake systems faults; including wheel flats where no other cause had been identified | 25 |
| M8 | Technical failures above the Solebar | 22 |
| OH | ARS / TMS / SARS software problem (excluding scheduling issues and technical failures) | 22 |
| J8 | OTM DAMAGE | 19 |
| I5 | Possession over-run from planned work | 18 |
| OC | Signaller including mis-routing (not ERTM /ETCS related) | 17 |
| I2 | AC/DC trip (including no fault or cause found) | 16 |