Kensal Rise

KNR Anglia route
CSV JSON

13 delay minutes

Most of the delay picked up at Kensal Rise in the four weeks to 9 December 2023 came from signal, points and power faults.

23% of these minutes were knock-on from something that happened elsewhere first. 100% of them were agreed between Network Rail and the operators when the file came out on 5 Jan 2024.

By cause

Delay minutes by cause in 2023-24 P09
CauseMinutesShareNetwork-wideTrains cancelled
Network Rail's causes
Track538%8%-
Signals, points and power862%16%2
Weather and structures--7%-
Autumn--7%-
External--4%2
Network management--17%-
The operators' causes
Train faults--16%1
Traincrew--11%1
Stations--3%-
Operations--5%-
Operator, other--7%-

Quiet enough here (under 100 delay minutes a period on average) that comparing years would mostly be noise, so there's no comparison.

Period by period

Delay minutes a day, period by period. Gridlines every 1 minutes. Hatched periods were under 94% agreed when their file came out, so they may still move. Pick a bar to see that period.

The codes behind it

In 2023-24 P09
CodeWhat Network Rail loggedMinutes
IBPoints failure (including no fault found)5
IRBroken/cracked/twisted/buckled/flawed rail5
IASignal failure (including no fault found)3
Since 2018
CodeWhat Network Rail loggedMinutes
IBPoints failure (including no fault found)56
TGDriver56
JPFailure to maintain vegetation within network boundaries in accordance with prevailing Network Rail standards25
MNBrake and brake systems faults; including wheel flats where no other cause had been identified25
M8Technical failures above the Solebar22
OHARS / TMS / SARS software problem (excluding scheduling issues and technical failures)22
J8OTM DAMAGE19
I5Possession over-run from planned work18
OCSignaller including mis-routing (not ERTM /ETCS related)17
I2AC/DC trip (including no fault or cause found)16