422 delay minutes
The biggest share (22%) of the delay picked up at Kirkby Stephen in the four weeks to 9 December 2023 came from faulty trains.
27% of these minutes were knock-on from something that happened elsewhere first. 96% of them were agreed between Network Rail and the operators when the file came out on 5 Jan 2024.
By cause
| Cause | Minutes | Share | Network-wide | A day, against the same period other years | Trains cancelled |
|---|---|---|---|---|---|
| Network Rail's causes | |||||
| Track | - | - | 8% | 0 a day, the least in 5 years | - |
| Signals, points and power | 29 | 7% | 16% | 1 a day, more than 1 of the other 4 years | - |
| Weather and structures | 80 | 19% | 7% | 3 a day, the most in 5 years | 1 |
| Autumn | 50 | 12% | 7% | 2 a day, more than 1 of the other 4 years | - |
| External | 3 | <1% | 4% | 0 a day, the most in 5 years | - |
| Network management | 71 | 17% | 17% | 3 a day, more than 2 of the other 4 years | - |
| The operators' causes | |||||
| Train faults | 93 | 22% | 16% | 3 a day, more than 3 of the other 4 years | - |
| Traincrew | 1 | <1% | 11% | 0 a day, more than 1 of the other 4 years | - |
| Stations | 2 | <1% | 3% | 0 a day, the least in 5 years | - |
| Operations | 6 | 1% | 5% | 0 a day, the least in 5 years | - |
| Operator, other | 87 | 21% | 7% | 3 a day, the most in 5 years | - |
Period by period
The codes behind it
| Code | What Network Rail logged | Minutes |
|---|---|---|
| MN | Brake and brake systems faults; including wheel flats where no other cause had been identified | 72 |
| Q3 | NZ Pumps T | 50 |
| TT | Leaf fall Neutral | 50 |
| X2 | Severe flooding beyond that which could be mitigated on Network Rail infrastructure | 46 |
| JK | Flooding not due to exceptional weather | 27 |
| MP | Rail / wheel interface, adhesion problems (including ice on the running rail) | 27 |
| OK | Delay caused by Operating staff oversight, issues or absence (excluding signallers and Control) | 26 |
| IB | Points failure (including no fault found) | 24 |
| OM | Technical failure associated with a Railhead conditioning train | 19 |
| MC | Diesel Loco failure, defect, attention | 18 |
| Code | What Network Rail logged | Minutes |
|---|---|---|
| IA | Signal failure (including no fault found) | 1,847 |
| RB | Passengers joining/alighting | 1,324 |
| IB | Points failure (including no fault found) | 1,039 |
| J3 | Axle Counter Failure | 939 |
| MC | Diesel Loco failure, defect, attention | 906 |
| Q3 | NZ Pumps T | 846 |
| IF | Train Describer/Panel/ARS/SSI/TDM Remote Control failure | 785 |
| IC | Track circuit failure (including no fault found) | 713 |
| ML | Wagons, coaches and parcel vehicle faults | 704 |
| I8 | Animal Strike or Incursion within the control of Network Rail | 661 |