Leaves on the Line

Kent House

KTH Kent route
CSV JSON

0 delay minutes

No delay was picked up at Kent House in the four weeks to 9 December 2023.

100% of them were agreed between Network Rail and the operators when the file came out on 5 Jan 2024.

By cause

Delay minutes by cause in 2023-24 P09
CauseMinutesShareNetwork-wideTrains cancelled
Network Rail's causes
Track--8%-
Signals, points and power--16%-
Weather and structures--7%-
Autumn--7%-
External--4%-
Network management--17%-
The operators' causes
Train faults--16%-
Traincrew--11%-
Stations--3%-
Operations--5%-
Operator, other--7%-

Quiet enough here (under 100 delay minutes a period on average) that comparing years would mostly be noise, so there's no comparison.

Period by period

Delay minutes a day, period by period. Gridlines every 1 minutes. Hatched periods were under 94% agreed when their file came out, so they may still move. Pick a bar to see that period.

The codes behind it

In 2023-24 P09
CodeWhat Network Rail loggedMinutes
Nothing logged.
Since 2018
CodeWhat Network Rail loggedMinutes
XKNational Grid Power Failure - local area also affected (inc outage, surges, blips where working standby generator/UPS installed)77
TZOther Passenger Train Operating Company causes52
JLSafety related incident caused by maintenance or infrastructure staff oversight or error (not Operations staff)47
IBPoints failure (including no fault found)42
M8Technical failures above the Solebar36
VHPassenger Communication cord, door egress or emergency train alarm operated26
ICTrack circuit failure (including no fault found)24
JXMiscellaneous items on track including litter (not including leaves, result of vandalism, weather or fallen/thrown from trains)21
IFTrain Describer/Panel/ARS/SSI/TDM Remote Control failure18
OCSignaller including mis-routing (not ERTM /ETCS related)15