Kentish Town

KTN East Midlands route
CSV JSON

282 delay minutes

The biggest share (37%) of the delay picked up at Kentish Town in the four weeks to 9 December 2023 came from how the network was run.

76% of these minutes were knock-on from something that happened elsewhere first. 94% of them were agreed between Network Rail and the operators when the file came out on 5 Jan 2024.

By cause

Delay minutes by cause in 2023-24 P09
CauseMinutesShareNetwork-wideA day, against the same period other yearsTrains cancelled
Network Rail's causes
Track217%8% 1 a day, more than 3 of the other 4 years-
Signals, points and power6423%16% 2 a day, more than 3 of the other 4 years9
Weather and structures2<1%7% 0 a day, more than 2 of the other 4 years-
Autumn62%7% 0 a day, more than 3 of the other 4 years-
External197%4% 1 a day, more than 3 of the other 4 years-
Network management10537%17% 4 a day, more than 2 of the other 4 years9
The operators' causes
Train faults83%16% 0 a day, the least in 5 years2
Traincrew3813%11% 1 a day, the most in 5 years12
Stations104%3% 0 a day, more than 3 of the other 4 years-
Operations--5% 0 a day, the least in 5 years-
Operator, other93%7% 0 a day, more than 1 of the other 4 years3

Period by period

Delay minutes a day, period by period. Gridlines every 10 minutes. Hatched periods were under 94% agreed when their file came out, so they may still move. Pick a bar to see that period.

The codes behind it

In 2023-24 P09
CodeWhat Network Rail loggedMinutes
TGDriver35
IBPoints failure (including no fault found)26
OCSignaller including mis-routing (not ERTM /ETCS related)26
ICTrack circuit failure (including no fault found)24
ISTrack defects (other than rail defects) inc. fish plates, wet beds etc.18
XBVandalism or theft (including the placing of objects on the line)18
ZSNo Cause ascertainable for a Sub-Threshold Delay causing Threshold Reactionary (where agreed by both parties)17
OKDelay caused by Operating staff oversight, issues or absence (excluding signallers and Control)11
RXStation delay due overcrowding due unplanned events or incident (line or station closure) where causal event is not determined10
J5Infrastructure Asset fault reported but proven to be mistaken8
Since 2018
CodeWhat Network Rail loggedMinutes
TGDriver1,989
M8Technical failures above the Solebar1,267
ISTrack defects (other than rail defects) inc. fish plates, wet beds etc.933
ZSNo Cause ascertainable for a Sub-Threshold Delay causing Threshold Reactionary (where agreed by both parties)663
OCSignaller including mis-routing (not ERTM /ETCS related)512
TITraincrew rostering problem498
IBPoints failure (including no fault found)466
OUDelays not Investigated by Network Rail375
I1Overhead line/third rail defect372
ICTrack circuit failure (including no fault found)360