Kiveton Park
728 delay minutes
The biggest share (22%) of the delay picked up at Kiveton Park in the four weeks to 9 December 2023 came from how the network was run.
84% of these minutes were knock-on from something that happened elsewhere first. 91% of them were agreed between Network Rail and the operators when the file came out on 5 Jan 2024, so they may still move.
By cause
| Cause | Minutes | Share | Network-wide | A day, against the same period other years | Trains cancelled |
|---|---|---|---|---|---|
| Network Rail's causes | |||||
| Track | 59 | 8% | 8% | 2 a day, more than 2 of the other 4 years | - |
| Signals, points and power | 56 | 8% | 16% | 2 a day, more than 1 of the other 4 years | - |
| Weather and structures | 70 | 10% | 7% | 3 a day, more than 3 of the other 4 years | - |
| Autumn | 53 | 7% | 7% | 2 a day, more than 1 of the other 4 years | - |
| External | 13 | 2% | 4% | 0 a day, the least in 5 years | - |
| Network management | 162 | 22% | 17% | 6 a day, more than 1 of the other 4 years | - |
| The operators' causes | |||||
| Train faults | 94 | 13% | 16% | 3 a day, the least in 5 years | 1 |
| Traincrew | 75 | 10% | 11% | 3 a day, more than 3 of the other 4 years | - |
| Stations | 46 | 6% | 3% | 2 a day, more than 2 of the other 4 years | - |
| Operations | 72 | 10% | 5% | 3 a day, more than 3 of the other 4 years | - |
| Operator, other | 29 | 4% | 7% | 1 a day, the least in 5 years | - |
Period by period
The codes behind it
| Code | What Network Rail logged | Minutes |
|---|---|---|
| OU | Delays not Investigated by Network Rail | 51 |
| IS | Track defects (other than rail defects) inc. fish plates, wet beds etc. | 48 |
| TG | Driver | 42 |
| XW | Severe weather not snow affecting infrastructure the responsibility of Network Rail | 42 |
| M7 | Door and Door system faults | 27 |
| TZ | Other Passenger Train Operating Company causes | 26 |
| Q3 | NZ Pumps T | 25 |
| RC | re-booked assistance for a person with reduced mobility joining/alighting, | 23 |
| TH | (Senior) Conductor/Train Manager | 22 |
| MN | Brake and brake systems faults; including wheel flats where no other cause had been identified | 21 |
| Code | What Network Rail logged | Minutes |
|---|---|---|
| TG | Driver | 2,454 |
| MD | Technical failures below the solebar | 2,301 |
| IB | Points failure (including no fault found) | 1,723 |
| MS | Planned underpowered or shortformed service and or vehicle, incl. exam set swaps | 1,527 |
| M8 | Technical failures above the Solebar | 1,020 |
| IC | Track circuit failure (including no fault found) | 977 |
| IS | Track defects (other than rail defects) inc. fish plates, wet beds etc. | 969 |
| IF | Train Describer/Panel/ARS/SSI/TDM Remote Control failure | 937 |
| TH | (Senior) Conductor/Train Manager | 920 |
| M7 | Door and Door system faults | 919 |