Leaves on the Line

Kew Bridge

KWB Wessex route
CSV JSON

0 delay minutes

No delay was picked up at Kew Bridge in the four weeks to 9 December 2023.

100% of them were agreed between Network Rail and the operators when the file came out on 5 Jan 2024.

By cause

Delay minutes by cause in 2023-24 P09
CauseMinutesShareNetwork-wideTrains cancelled
Network Rail's causes
Track--8%-
Signals, points and power--16%-
Weather and structures--7%-
Autumn--7%-
External--4%-
Network management--17%-
The operators' causes
Train faults--16%-
Traincrew--11%-
Stations--3%-
Operations--5%-
Operator, other--7%1

Quiet enough here (under 100 delay minutes a period on average) that comparing years would mostly be noise, so there's no comparison.

Period by period

Delay minutes a day, period by period. Gridlines every 2 minutes. Hatched periods were under 94% agreed when their file came out, so they may still move. Pick a bar to see that period.

The codes behind it

In 2023-24 P09
CodeWhat Network Rail loggedMinutes
Nothing logged.
Since 2018
CodeWhat Network Rail loggedMinutes
IFTrain Describer/Panel/ARS/SSI/TDM Remote Control failure54
QNVSTP Schedule/ VSTP Process (TSI created schedule)49
I5Possession over-run from planned work23
ZSNo Cause ascertainable for a Sub-Threshold Delay causing Threshold Reactionary (where agreed by both parties)18
TGDriver16
TITraincrew rostering problem14
FETrain Crew not available including after rest10
ODDelays due to National/Regional/Route Operations directives or Route Control decision or directive10
OEFailure to lay Sandite or operate Railhead Conditioning train as programmed10
MSPlanned underpowered or shortformed service and or vehicle, incl. exam set swaps7