Laindon
53 delay minutes
The biggest share (36%) of the delay picked up at Laindon in the four weeks to 9 December 2023 came from how the network was run.
60% of these minutes were knock-on from something that happened elsewhere first. 100% of them were agreed between Network Rail and the operators when the file came out on 5 Jan 2024.
By cause
| Cause | Minutes | Share | Network-wide | A day, against the same period other years | Trains cancelled |
|---|---|---|---|---|---|
| Network Rail's causes | |||||
| Track | - | - | 8% | 0 a day, the least in 5 years | - |
| Signals, points and power | 3 | 6% | 16% | 0 a day, more than 1 of the other 4 years | - |
| Weather and structures | - | - | 7% | 0 a day, the least in 5 years | - |
| Autumn | 3 | 5% | 7% | 0 a day, the most in 5 years | - |
| External | - | - | 4% | 0 a day, the least in 5 years | - |
| Network management | 19 | 36% | 17% | 1 a day, more than 3 of the other 4 years | 1 |
| The operators' causes | |||||
| Train faults | - | - | 16% | 0 a day, the least in 5 years | 1 |
| Traincrew | 17 | 32% | 11% | 1 a day, the most in 5 years | - |
| Stations | 1 | 2% | 3% | 0 a day, the least in 5 years | - |
| Operations | 3 | 6% | 5% | 0 a day, more than 2 of the other 4 years | - |
| Operator, other | 8 | 14% | 7% | 0 a day, more than 3 of the other 4 years | - |
Period by period
The codes behind it
| Code | What Network Rail logged | Minutes |
|---|---|---|
| TG | Driver | 14 |
| OK | Delay caused by Operating staff oversight, issues or absence (excluding signallers and Control) | 11 |
| JX | Miscellaneous items on track including litter (not including leaves, result of vandalism, weather or fallen/thrown from trains) | 7 |
| VH | Passenger Communication cord, door egress or emergency train alarm operated | 5 |
| FC | Freight Train Driver error, SPAD, Wrong routing or Missed AWS/DSD [No change] | 3 |
| FX | Freight train running at lower class or speed than planned classification or overweight | 3 |
| MP | Rail / wheel interface, adhesion problems (including ice on the running rail) | 3 |
| Q3 | NZ Pumps T | 3 |
| IB | Points failure (including no fault found) | 2 |
| IC | Track circuit failure (including no fault found) | 1 |
| Code | What Network Rail logged | Minutes |
|---|---|---|
| IV | Cutting or embankment earthslip, rock fall or subsidence (not the result of severe weather on the day of failure) | 1,310 |
| IS | Track defects (other than rail defects) inc. fish plates, wet beds etc. | 1,078 |
| VH | Passenger Communication cord, door egress or emergency train alarm operated | 368 |
| TG | Driver | 341 |
| TW | Driver adhering to company professional driving standards or policy | 331 |
| IF | Train Describer/Panel/ARS/SSI/TDM Remote Control failure | 309 |
| MN | Brake and brake systems faults; including wheel flats where no other cause had been identified | 297 |
| XW | Severe weather not snow affecting infrastructure the responsibility of Network Rail | 272 |
| M8 | Technical failures above the Solebar | 257 |
| I8 | Animal Strike or Incursion within the control of Network Rail | 240 |