Lancaster
2,521 delay minutes
The biggest share (22%) of the delay picked up at Lancaster in the four weeks to 9 December 2023 came from faulty trains.
76% of these minutes were knock-on from something that happened elsewhere first. 88% of them were agreed between Network Rail and the operators when the file came out on 5 Jan 2024, so they may still move.
By cause
| Cause | Minutes | Share | Network-wide | A day, against the same period other years | Trains cancelled |
|---|---|---|---|---|---|
| Network Rail's causes | |||||
| Track | 26 | 1% | 8% | 1 a day, the least in 5 years | 1 |
| Signals, points and power | 458 | 18% | 16% | 16 a day, more than 2 of the other 4 years | 5 |
| Weather and structures | 142 | 6% | 7% | 5 a day, more than 3 of the other 4 years | 11 |
| Autumn | 38 | 1% | 7% | 1 a day, more than 2 of the other 4 years | - |
| External | 82 | 3% | 4% | 3 a day, more than 3 of the other 4 years | 1 |
| Network management | 432 | 17% | 17% | 15 a day, more than 3 of the other 4 years | 29 |
| The operators' causes | |||||
| Train faults | 550 | 22% | 16% | 20 a day, more than 3 of the other 4 years | 16 |
| Traincrew | 465 | 18% | 11% | 17 a day, the most in 5 years | 83 |
| Stations | 68 | 3% | 3% | 2 a day, more than 2 of the other 4 years | 1 |
| Operations | 157 | 6% | 5% | 6 a day, the most in 5 years | 3 |
| Operator, other | 105 | 4% | 7% | 4 a day, more than 3 of the other 4 years | 7 |
Period by period
The codes behind it
| Code | What Network Rail logged | Minutes |
|---|---|---|
| TH | (Senior) Conductor/Train Manager | 241 |
| IB | Points failure (including no fault found) | 223 |
| TG | Driver | 207 |
| M8 | Technical failures above the Solebar | 101 |
| JL | Safety related incident caused by maintenance or infrastructure staff oversight or error (not Operations staff) | 79 |
| XP | BRIDGE HIT | 79 |
| Q1 | Takeback Pumps | 76 |
| X2 | Severe flooding beyond that which could be mitigated on Network Rail infrastructure | 72 |
| IA | Signal failure (including no fault found) | 68 |
| IH | Power Supply And Distribution System Failure | 67 |
| Code | What Network Rail logged | Minutes |
|---|---|---|
| TG | Driver | 11,761 |
| IB | Points failure (including no fault found) | 7,160 |
| MD | Technical failures below the solebar | 5,671 |
| TH | (Senior) Conductor/Train Manager | 4,263 |
| IS | Track defects (other than rail defects) inc. fish plates, wet beds etc. | 3,915 |
| M8 | Technical failures above the Solebar | 3,690 |
| I1 | Overhead line/third rail defect | 3,260 |
| IR | Broken/cracked/twisted/buckled/flawed rail | 3,234 |
| IC | Track circuit failure (including no fault found) | 2,707 |
| IV | Cutting or embankment earthslip, rock fall or subsidence (not the result of severe weather on the day of failure) | 2,674 |