London Bridge
7,533 delay minutes
The biggest share (20%) of the delay picked up at London Bridge in the four weeks to 9 December 2023 came from how the network was run.
83% of these minutes were knock-on from something that happened elsewhere first. 95% of them were agreed between Network Rail and the operators when the file came out on 5 Jan 2024.
By cause
| Cause | Minutes | Share | Network-wide | A day, against the same period other years | Trains cancelled |
|---|---|---|---|---|---|
| Network Rail's causes | |||||
| Track | 459 | 6% | 8% | 16 a day, more than 2 of the other 4 years | 6 |
| Signals, points and power | 1,243 | 17% | 16% | 44 a day, more than 1 of the other 4 years | 27 |
| Weather and structures | 35 | <1% | 7% | 1 a day, the least in 5 years | - |
| Autumn | 382 | 5% | 7% | 14 a day, more than 2 of the other 4 years | 3 |
| External | 215 | 3% | 4% | 8 a day, more than 1 of the other 4 years | 13 |
| Network management | 1,521 | 20% | 17% | 54 a day, the least in 5 years | 43 |
| The operators' causes | |||||
| Train faults | 1,443 | 19% | 16% | 52 a day, more than 3 of the other 4 years | 62 |
| Traincrew | 894 | 12% | 11% | 32 a day, the least in 5 years | 22 |
| Stations | 199 | 3% | 3% | 7 a day, the least in 5 years | - |
| Operations | 164 | 2% | 5% | 6 a day, the least in 5 years | 5 |
| Operator, other | 979 | 13% | 7% | 35 a day, more than 2 of the other 4 years | 16 |
Period by period
The codes behind it
| Code | What Network Rail logged | Minutes |
|---|---|---|
| MN | Brake and brake systems faults; including wheel flats where no other cause had been identified | 695 |
| TG | Driver | 691 |
| VH | Passenger Communication cord, door egress or emergency train alarm operated | 552 |
| ZS | No Cause ascertainable for a Sub-Threshold Delay causing Threshold Reactionary (where agreed by both parties) | 407 |
| IS | Track defects (other than rail defects) inc. fish plates, wet beds etc. | 392 |
| Q3 | NZ Pumps T | 336 |
| TT | Leaf fall Neutral | 331 |
| IC | Track circuit failure (including no fault found) | 288 |
| OC | Signaller including mis-routing (not ERTM /ETCS related) | 287 |
| M8 | Technical failures above the Solebar | 228 |
| Code | What Network Rail logged | Minutes |
|---|---|---|
| TG | Driver | 51,592 |
| ZS | No Cause ascertainable for a Sub-Threshold Delay causing Threshold Reactionary (where agreed by both parties) | 48,987 |
| IC | Track circuit failure (including no fault found) | 32,694 |
| IB | Points failure (including no fault found) | 25,578 |
| OC | Signaller including mis-routing (not ERTM /ETCS related) | 25,270 |
| IF | Train Describer/Panel/ARS/SSI/TDM Remote Control failure | 21,131 |
| IS | Track defects (other than rail defects) inc. fish plates, wet beds etc. | 19,444 |
| VH | Passenger Communication cord, door egress or emergency train alarm operated | 17,760 |
| IR | Broken/cracked/twisted/buckled/flawed rail | 16,728 |
| OB | Delayed by signaller not applying applicable regulating policy | 15,729 |