Leaves on the Line

London Bridge

LBG Kent route
CSV JSON

7,533 delay minutes

The biggest share (20%) of the delay picked up at London Bridge in the four weeks to 9 December 2023 came from how the network was run.

83% of these minutes were knock-on from something that happened elsewhere first. 95% of them were agreed between Network Rail and the operators when the file came out on 5 Jan 2024.

By cause

Delay minutes by cause in 2023-24 P09
CauseMinutesShareNetwork-wideA day, against the same period other yearsTrains cancelled
Network Rail's causes
Track4596%8% 16 a day, more than 2 of the other 4 years6
Signals, points and power1,24317%16% 44 a day, more than 1 of the other 4 years27
Weather and structures35<1%7% 1 a day, the least in 5 years-
Autumn3825%7% 14 a day, more than 2 of the other 4 years3
External2153%4% 8 a day, more than 1 of the other 4 years13
Network management1,52120%17% 54 a day, the least in 5 years43
The operators' causes
Train faults1,44319%16% 52 a day, more than 3 of the other 4 years62
Traincrew89412%11% 32 a day, the least in 5 years22
Stations1993%3% 7 a day, the least in 5 years-
Operations1642%5% 6 a day, the least in 5 years5
Operator, other97913%7% 35 a day, more than 2 of the other 4 years16

Period by period

Delay minutes a day, period by period. Gridlines every 200 minutes. Hatched periods were under 94% agreed when their file came out, so they may still move. Pick a bar to see that period.

The codes behind it

In 2023-24 P09
CodeWhat Network Rail loggedMinutes
MNBrake and brake systems faults; including wheel flats where no other cause had been identified695
TGDriver691
VHPassenger Communication cord, door egress or emergency train alarm operated552
ZSNo Cause ascertainable for a Sub-Threshold Delay causing Threshold Reactionary (where agreed by both parties)407
ISTrack defects (other than rail defects) inc. fish plates, wet beds etc.392
Q3NZ Pumps T336
TTLeaf fall Neutral331
ICTrack circuit failure (including no fault found)288
OCSignaller including mis-routing (not ERTM /ETCS related)287
M8Technical failures above the Solebar228
Since 2018
CodeWhat Network Rail loggedMinutes
TGDriver51,592
ZSNo Cause ascertainable for a Sub-Threshold Delay causing Threshold Reactionary (where agreed by both parties)48,987
ICTrack circuit failure (including no fault found)32,694
IBPoints failure (including no fault found)25,578
OCSignaller including mis-routing (not ERTM /ETCS related)25,270
IFTrain Describer/Panel/ARS/SSI/TDM Remote Control failure21,131
ISTrack defects (other than rail defects) inc. fish plates, wet beds etc.19,444
VHPassenger Communication cord, door egress or emergency train alarm operated17,760
IRBroken/cracked/twisted/buckled/flawed rail16,728
OBDelayed by signaller not applying applicable regulating policy15,729