Leaves on the Line

Loughborough (Leics)

LBO East Midlands route
CSV JSON

1,238 delay minutes

The biggest share (21%) of the delay picked up at Loughborough (Leics) in the four weeks to 9 December 2023 came from weather and structures.

60% of these minutes were knock-on from something that happened elsewhere first. 82% of them were agreed between Network Rail and the operators when the file came out on 5 Jan 2024, so they may still move.

By cause

Delay minutes by cause in 2023-24 P09
CauseMinutesShareNetwork-wideA day, against the same period other yearsTrains cancelled
Network Rail's causes
Track655%8% 2 a day, more than 2 of the other 4 years-
Signals, points and power867%16% 3 a day, more than 1 of the other 4 years-
Weather and structures26121%7% 9 a day, the most in 5 years1
Autumn1099%7% 4 a day, the most in 5 years-
External181%4% 1 a day, more than 2 of the other 4 years-
Network management24220%17% 9 a day, more than 3 of the other 4 years-
The operators' causes
Train faults19416%16% 7 a day, the most in 5 years1
Traincrew806%11% 3 a day, more than 3 of the other 4 years-
Stations595%3% 2 a day, the most in 5 years-
Operations192%5% 1 a day, more than 1 of the other 4 years-
Operator, other1079%7% 4 a day, more than 3 of the other 4 years-

Period by period

Delay minutes a day, period by period. Gridlines every 20 minutes. Hatched periods were under 94% agreed when their file came out, so they may still move. Pick a bar to see that period.

The codes behind it

In 2023-24 P09
CodeWhat Network Rail loggedMinutes
JKFlooding not due to exceptional weather189
MDTechnical failures below the solebar80
XWSevere weather not snow affecting infrastructure the responsibility of Network Rail57
QJSpecial working for leaf-fall track circuit operation42
TGDriver37
ZSNo Cause ascertainable for a Sub-Threshold Delay causing Threshold Reactionary (where agreed by both parties)36
Q3NZ Pumps T35
FWLate start/yard overtime not explained by Operator32
QICautioning due to railhead leaf contamination32
I5Possession over-run from planned work30
Since 2018
CodeWhat Network Rail loggedMinutes
TGDriver1,851
MDTechnical failures below the solebar1,809
M8Technical failures above the Solebar1,767
ZUNo Cause Identified After investigation by both Parties1,624
ZSNo Cause ascertainable for a Sub-Threshold Delay causing Threshold Reactionary (where agreed by both parties)1,596
IBPoints failure (including no fault found)1,557
OCSignaller including mis-routing (not ERTM /ETCS related)1,502
ISTrack defects (other than rail defects) inc. fish plates, wet beds etc.1,496
FWLate start/yard overtime not explained by Operator997
ICTrack circuit failure (including no fault found)976