2,726 delay minutes

The biggest share (24%) of the delay picked up at Lincoln Central in the four weeks to 9 December 2023 came from autumn leaves.

36% of these minutes were knock-on from something that happened elsewhere first. 95% of them were agreed between Network Rail and the operators when the file came out on 5 Jan 2024.

By cause

Delay minutes by cause in 2023-24 P09
CauseMinutesShareNetwork-wideA day, against the same period other yearsTrains cancelled
Network Rail's causes
Track823%8% 3 a day, more than 1 of the other 4 years-
Signals, points and power61122%16% 22 a day, the most in 5 years5
Weather and structures482%7% 2 a day, more than 1 of the other 4 years-
Autumn66824%7% 24 a day, the most in 5 years3
External1616%4% 6 a day, more than 3 of the other 4 years-
Network management27810%17% 10 a day, more than 3 of the other 4 years41
The operators' causes
Train faults53320%16% 19 a day, the most in 5 years13
Traincrew1586%11% 6 a day, more than 2 of the other 4 years24
Stations984%3% 3 a day, more than 2 of the other 4 years-
Operations12<1%5% 0 a day, the least in 5 years1
Operator, other803%7% 3 a day, more than 1 of the other 4 years-

Period by period

Delay minutes a day, period by period. Gridlines every 50 minutes. Hatched periods were under 94% agreed when their file came out, so they may still move. Pick a bar to see that period.

The codes behind it

In 2023-24 P09
CodeWhat Network Rail loggedMinutes
QJSpecial working for leaf-fall track circuit operation547
M8Technical failures above the Solebar194
IASignal failure (including no fault found)162
MDTechnical failures below the solebar157
IDLevel crossing faults and failure incl. barrow/foot crossings and crossing treadles104
ICTrack circuit failure (including no fault found)87
OUDelays not Investigated by Network Rail80
TGDriver71
I1Overhead line/third rail defect70
ISTrack defects (other than rail defects) inc. fish plates, wet beds etc.67
Since 2018
CodeWhat Network Rail loggedMinutes
MDTechnical failures below the solebar6,462
TGDriver5,407
ICTrack circuit failure (including no fault found)4,991
M8Technical failures above the Solebar3,963
IDLevel crossing faults and failure incl. barrow/foot crossings and crossing treadles2,981
QJSpecial working for leaf-fall track circuit operation2,936
IFTrain Describer/Panel/ARS/SSI/TDM Remote Control failure2,288
ISTrack defects (other than rail defects) inc. fish plates, wet beds etc.2,262
IASignal failure (including no fault found)2,145
M7Door and Door system faults1,965