Leaves on the Line

Leeds

LDS North & East route
CSV JSON

29,371 delay minutes

The biggest share (17%) of the delay picked up at Leeds in the four weeks to 9 December 2023 came from faulty trains.

68% of these minutes were knock-on from something that happened elsewhere first. 90% of them were agreed between Network Rail and the operators when the file came out on 5 Jan 2024, so they may still move.

By cause

Delay minutes by cause in 2023-24 P09
CauseMinutesShareNetwork-wideA day, against the same period other yearsTrains cancelled
Network Rail's causes
Track2,3398%8% 84 a day, more than 3 of the other 4 years22
Signals, points and power2,3668%16% 85 a day, more than 2 of the other 4 years50
Weather and structures3,80813%7% 136 a day, the most in 5 years104
Autumn2,0847%7% 74 a day, more than 2 of the other 4 years1
External2,7659%4% 99 a day, the most in 5 years32
Network management3,33211%17% 119 a day, more than 2 of the other 4 years226
The operators' causes
Train faults5,02617%16% 180 a day, more than 2 of the other 4 years90
Traincrew4,31215%11% 154 a day, more than 3 of the other 4 years411
Stations7513%3% 27 a day, more than 2 of the other 4 years-
Operations1,0604%5% 38 a day, more than 3 of the other 4 years12
Operator, other1,5305%7% 55 a day, more than 1 of the other 4 years3

Period by period

Delay minutes a day, period by period. Gridlines every 500 minutes. Hatched periods were under 94% agreed when their file came out, so they may still move. Pick a bar to see that period.

The codes behind it

In 2023-24 P09
CodeWhat Network Rail loggedMinutes
TGDriver2,533
XOExternal trees, building or structures encroaching or falling onto network infrastructure (not weather or vandalism)2,311
XWSevere weather not snow affecting infrastructure the responsibility of Network Rail2,288
TH(Senior) Conductor/Train Manager1,463
OUDelays not Investigated by Network Rail1,316
IRBroken/cracked/twisted/buckled/flawed rail1,306
Q3NZ Pumps T996
ISTrack defects (other than rail defects) inc. fish plates, wet beds etc.970
MDTechnical failures below the solebar960
M8Technical failures above the Solebar954
Since 2018
CodeWhat Network Rail loggedMinutes
TGDriver97,239
MDTechnical failures below the solebar63,427
MSPlanned underpowered or shortformed service and or vehicle, incl. exam set swaps55,867
MUDepot operating problem36,154
TH(Senior) Conductor/Train Manager35,031
M8Technical failures above the Solebar34,191
M7Door and Door system faults28,738
MNBrake and brake systems faults; including wheel flats where no other cause had been identified27,795
IBPoints failure (including no fault found)20,864
ISTrack defects (other than rail defects) inc. fish plates, wet beds etc.18,731