Leeds
29,371 delay minutes
The biggest share (17%) of the delay picked up at Leeds in the four weeks to 9 December 2023 came from faulty trains.
68% of these minutes were knock-on from something that happened elsewhere first. 90% of them were agreed between Network Rail and the operators when the file came out on 5 Jan 2024, so they may still move.
By cause
| Cause | Minutes | Share | Network-wide | A day, against the same period other years | Trains cancelled |
|---|---|---|---|---|---|
| Network Rail's causes | |||||
| Track | 2,339 | 8% | 8% | 84 a day, more than 3 of the other 4 years | 22 |
| Signals, points and power | 2,366 | 8% | 16% | 85 a day, more than 2 of the other 4 years | 50 |
| Weather and structures | 3,808 | 13% | 7% | 136 a day, the most in 5 years | 104 |
| Autumn | 2,084 | 7% | 7% | 74 a day, more than 2 of the other 4 years | 1 |
| External | 2,765 | 9% | 4% | 99 a day, the most in 5 years | 32 |
| Network management | 3,332 | 11% | 17% | 119 a day, more than 2 of the other 4 years | 226 |
| The operators' causes | |||||
| Train faults | 5,026 | 17% | 16% | 180 a day, more than 2 of the other 4 years | 90 |
| Traincrew | 4,312 | 15% | 11% | 154 a day, more than 3 of the other 4 years | 411 |
| Stations | 751 | 3% | 3% | 27 a day, more than 2 of the other 4 years | - |
| Operations | 1,060 | 4% | 5% | 38 a day, more than 3 of the other 4 years | 12 |
| Operator, other | 1,530 | 5% | 7% | 55 a day, more than 1 of the other 4 years | 3 |
Period by period
The codes behind it
| Code | What Network Rail logged | Minutes |
|---|---|---|
| TG | Driver | 2,533 |
| XO | External trees, building or structures encroaching or falling onto network infrastructure (not weather or vandalism) | 2,311 |
| XW | Severe weather not snow affecting infrastructure the responsibility of Network Rail | 2,288 |
| TH | (Senior) Conductor/Train Manager | 1,463 |
| OU | Delays not Investigated by Network Rail | 1,316 |
| IR | Broken/cracked/twisted/buckled/flawed rail | 1,306 |
| Q3 | NZ Pumps T | 996 |
| IS | Track defects (other than rail defects) inc. fish plates, wet beds etc. | 970 |
| MD | Technical failures below the solebar | 960 |
| M8 | Technical failures above the Solebar | 954 |
| Code | What Network Rail logged | Minutes |
|---|---|---|
| TG | Driver | 97,239 |
| MD | Technical failures below the solebar | 63,427 |
| MS | Planned underpowered or shortformed service and or vehicle, incl. exam set swaps | 55,867 |
| MU | Depot operating problem | 36,154 |
| TH | (Senior) Conductor/Train Manager | 35,031 |
| M8 | Technical failures above the Solebar | 34,191 |
| M7 | Door and Door system faults | 28,738 |
| MN | Brake and brake systems faults; including wheel flats where no other cause had been identified | 27,795 |
| IB | Points failure (including no fault found) | 20,864 |
| IS | Track defects (other than rail defects) inc. fish plates, wet beds etc. | 18,731 |