Most of the delay picked up at Lea Bridge in the four weeks to 9 December 2023 came from track faults.

0% of these minutes were knock-on from something that happened elsewhere first. 100% of them were agreed between Network Rail and the operators when the file came out on 5 Jan 2024.

By cause

Delay minutes by cause in 2023-24 P09
CauseMinutesShareNetwork-wideTrains cancelled
Network Rail's causes
Track13100%8%1
Signals, points and power--16%-
Weather and structures--7%-
Autumn--7%-
External--4%-
Network management--17%-
The operators' causes
Train faults--16%-
Traincrew--11%-
Stations--3%-
Operations--5%-
Operator, other--7%-

Quiet enough here (under 100 delay minutes a period on average) that comparing years would mostly be noise, so there's no comparison.

Period by period

Delay minutes a day, period by period. Gridlines every 1 minutes. Hatched periods were under 94% agreed when their file came out, so they may still move. Pick a bar to see that period.

The codes behind it

In 2023-24 P09
CodeWhat Network Rail loggedMinutes
ISTrack defects (other than rail defects) inc. fish plates, wet beds etc.13
Since 2018
CodeWhat Network Rail loggedMinutes
TOTime lost en-route believed to be Operator cause and information required form operatore (Ops Responsibility)26
XWSevere weather not snow affecting infrastructure the responsibility of Network Rail17
MFEngineering non-technical delays associated with Engineering staff who are not based in an Engineering depot e.g. Cleaners16
M8Technical failures above the Solebar14
X8Animal Strike or incursion not within the control of Network Rail14
ISTrack defects (other than rail defects) inc. fish plates, wet beds etc.13
MDTechnical failures below the solebar13
XNRoad or crossing related incidents inc. cars on line, crossing misuse and priority to emergency services (NOT bridge strikes)8
IFTrain Describer/Panel/ARS/SSI/TDM Remote Control failure7