Ledbury
576 delay minutes
The biggest share (26%) of the delay picked up at Ledbury in the four weeks to 9 December 2023 came from signal, points and power faults.
93% of these minutes were knock-on from something that happened elsewhere first. 91% of them were agreed between Network Rail and the operators when the file came out on 5 Jan 2024, so they may still move.
By cause
| Cause | Minutes | Share | Network-wide | A day, against the same period other years | Trains cancelled |
|---|---|---|---|---|---|
| Network Rail's causes | |||||
| Track | 63 | 11% | 8% | 2 a day, more than 1 of the other 4 years | - |
| Signals, points and power | 147 | 26% | 16% | 5 a day, the most in 5 years | 2 |
| Weather and structures | 26 | 5% | 7% | 1 a day, more than 2 of the other 4 years | 1 |
| Autumn | 12 | 2% | 7% | 0 a day, more than 1 of the other 4 years | - |
| External | 3 | <1% | 4% | 0 a day, the least in 5 years | - |
| Network management | 100 | 17% | 17% | 4 a day, more than 1 of the other 4 years | - |
| The operators' causes | |||||
| Train faults | 87 | 15% | 16% | 3 a day, more than 1 of the other 4 years | 1 |
| Traincrew | 75 | 13% | 11% | 3 a day, more than 2 of the other 4 years | - |
| Stations | 34 | 6% | 3% | 1 a day, more than 3 of the other 4 years | - |
| Operations | - | - | 5% | 0 a day, the least in 5 years | - |
| Operator, other | 30 | 5% | 7% | 1 a day, more than 2 of the other 4 years | - |
Period by period
The codes behind it
| Code | What Network Rail logged | Minutes |
|---|---|---|
| TG | Driver | 70 |
| IB | Points failure (including no fault found) | 57 |
| M8 | Technical failures above the Solebar | 47 |
| IS | Track defects (other than rail defects) inc. fish plates, wet beds etc. | 37 |
| IF | Train Describer/Panel/ARS/SSI/TDM Remote Control failure | 29 |
| ZS | No Cause ascertainable for a Sub-Threshold Delay causing Threshold Reactionary (where agreed by both parties) | 24 |
| IA | Signal failure (including no fault found) | 22 |
| JP | Failure to maintain vegetation within network boundaries in accordance with prevailing Network Rail standards | 21 |
| MU | Depot operating problem | 20 |
| RQ | Un-booked assistance for a person with reduced mobility joining/alighting, | 20 |
| Code | What Network Rail logged | Minutes |
|---|---|---|
| TG | Driver | 2,421 |
| IS | Track defects (other than rail defects) inc. fish plates, wet beds etc. | 1,746 |
| MD | Technical failures below the solebar | 1,736 |
| ZU | No Cause Identified After investigation by both Parties | 1,602 |
| IA | Signal failure (including no fault found) | 1,524 |
| IB | Points failure (including no fault found) | 1,310 |
| IC | Track circuit failure (including no fault found) | 1,289 |
| M8 | Technical failures above the Solebar | 1,255 |
| ZY | Univestigated station overtime System Roll-up Only | 1,119 |
| IF | Train Describer/Panel/ARS/SSI/TDM Remote Control failure | 1,115 |