Lee
8 delay minutes
Most of the delay picked up at Lee in the four weeks to 9 December 2023 came from faulty trains.
100% of these minutes were knock-on from something that happened elsewhere first. 100% of them were agreed between Network Rail and the operators when the file came out on 5 Jan 2024.
By cause
| Cause | Minutes | Share | Network-wide | Trains cancelled |
|---|---|---|---|---|
| Network Rail's causes | ||||
| Track | - | - | 8% | - |
| Signals, points and power | - | - | 16% | - |
| Weather and structures | - | - | 7% | - |
| Autumn | - | - | 7% | - |
| External | - | - | 4% | 1 |
| Network management | - | - | 17% | - |
| The operators' causes | ||||
| Train faults | 8 | 100% | 16% | - |
| Traincrew | - | - | 11% | - |
| Stations | - | - | 3% | - |
| Operations | - | - | 5% | - |
| Operator, other | - | - | 7% | - |
Quiet enough here (under 100 delay minutes a period on average) that comparing years would mostly be noise, so there's no comparison.
Period by period
The codes behind it
| Code | What Network Rail logged | Minutes |
|---|---|---|
| MU | Depot operating problem | 8 |
| Code | What Network Rail logged | Minutes |
|---|---|---|
| IC | Track circuit failure (including no fault found) | 90 |
| IR | Broken/cracked/twisted/buckled/flawed rail | 35 |
| X3 | Lightning Strike - damage to protected systems | 27 |
| I6 | Delays as a result of line blocks / track patrols (including late handback) | 26 |
| IA | Signal failure (including no fault found) | 25 |
| M9 | Reported fleet equipment defect - no fault found | 22 |
| MD | Technical failures below the solebar | 19 |
| IF | Train Describer/Panel/ARS/SSI/TDM Remote Control failure | 10 |
| M0 | Confirmed train cab based safety system fault (including GSMR) | 8 |
| XK | National Grid Power Failure - local area also affected (inc outage, surges, blips where working standby generator/UPS installed) | 8 |