Leaves on the Line

Leicester

LEI East Midlands route
CSV JSON

1,484 delay minutes

The biggest share (31%) of the delay picked up at Leicester in the four weeks to 9 December 2023 came from how the network was run.

63% of these minutes were knock-on from something that happened elsewhere first. 96% of them were agreed between Network Rail and the operators when the file came out on 5 Jan 2024.

By cause

Delay minutes by cause in 2023-24 P09
CauseMinutesShareNetwork-wideA day, against the same period other yearsTrains cancelled
Network Rail's causes
Track1409%8% 5 a day, more than 3 of the other 4 years2
Signals, points and power1128%16% 4 a day, the least in 5 years1
Weather and structures503%7% 2 a day, more than 3 of the other 4 years-
Autumn14110%7% 5 a day, the most in 5 years-
External332%4% 1 a day, more than 1 of the other 4 years-
Network management45431%17% 16 a day, more than 3 of the other 4 years21
The operators' causes
Train faults17112%16% 6 a day, the least in 5 years7
Traincrew20814%11% 7 a day, more than 3 of the other 4 years17
Stations423%3% 2 a day, the least in 5 years-
Operations825%5% 3 a day, the most in 5 years-
Operator, other524%7% 2 a day, the least in 5 years-

Period by period

Delay minutes a day, period by period. Gridlines every 20 minutes. Hatched periods were under 94% agreed when their file came out, so they may still move. Pick a bar to see that period.

The codes behind it

In 2023-24 P09
CodeWhat Network Rail loggedMinutes
I5Possession over-run from planned work233
TGDriver165
ISTrack defects (other than rail defects) inc. fish plates, wet beds etc.122
QJSpecial working for leaf-fall track circuit operation112
I8Animal Strike or Incursion within the control of Network Rail61
TRTrain Operating Company Directive56
ZSNo Cause ascertainable for a Sub-Threshold Delay causing Threshold Reactionary (where agreed by both parties)42
M8Technical failures above the Solebar34
MNBrake and brake systems faults; including wheel flats where no other cause had been identified28
MYCoupler, Coupler system and Jumper cable faults28
Since 2018
CodeWhat Network Rail loggedMinutes
TGDriver4,138
MDTechnical failures below the solebar3,831
IBPoints failure (including no fault found)3,659
M8Technical failures above the Solebar3,616
ISTrack defects (other than rail defects) inc. fish plates, wet beds etc.2,733
MCDiesel Loco failure, defect, attention2,712
OCSignaller including mis-routing (not ERTM /ETCS related)2,276
ICTrack circuit failure (including no fault found)2,132
XPBRIDGE HIT1,808
ZSNo Cause ascertainable for a Sub-Threshold Delay causing Threshold Reactionary (where agreed by both parties)1,665