2,838 delay minutes

The biggest share (23%) of the delay picked up at Lewisham in the four weeks to 9 December 2023 came from how the network was run.

85% of these minutes were knock-on from something that happened elsewhere first. 92% of them were agreed between Network Rail and the operators when the file came out on 5 Jan 2024, so they may still move.

By cause

Delay minutes by cause in 2023-24 P09
CauseMinutesShareNetwork-wideA day, against the same period other yearsTrains cancelled
Network Rail's causes
Track2087%8% 7 a day, more than 3 of the other 4 years-
Signals, points and power30211%16% 11 a day, the least in 5 years-
Weather and structures502%7% 2 a day, more than 3 of the other 4 years-
Autumn28810%7% 10 a day, more than 3 of the other 4 years-
External913%4% 3 a day, more than 2 of the other 4 years-
Network management66723%17% 24 a day, the least in 5 years-
The operators' causes
Train faults38514%16% 14 a day, more than 1 of the other 4 years-
Traincrew1746%11% 6 a day, more than 2 of the other 4 years-
Stations17<1%3% 1 a day, the least in 5 years-
Operations642%5% 2 a day, more than 1 of the other 4 years-
Operator, other59421%7% 21 a day, more than 2 of the other 4 years-

Period by period

Delay minutes a day, period by period. Gridlines every 50 minutes. Hatched periods were under 94% agreed when their file came out, so they may still move. Pick a bar to see that period.

The codes behind it

In 2023-24 P09
CodeWhat Network Rail loggedMinutes
ZSNo Cause ascertainable for a Sub-Threshold Delay causing Threshold Reactionary (where agreed by both parties)280
Q3NZ Pumps T272
TTLeaf fall Neutral251
VHPassenger Communication cord, door egress or emergency train alarm operated249
ISTrack defects (other than rail defects) inc. fish plates, wet beds etc.171
TGDriver143
IISignalling lineside cable fault117
OCSignaller including mis-routing (not ERTM /ETCS related)115
ICTrack circuit failure (including no fault found)88
OBDelayed by signaller not applying applicable regulating policy83
Since 2018
CodeWhat Network Rail loggedMinutes
ZSNo Cause ascertainable for a Sub-Threshold Delay causing Threshold Reactionary (where agreed by both parties)30,380
VHPassenger Communication cord, door egress or emergency train alarm operated10,478
ICTrack circuit failure (including no fault found)9,487
OCSignaller including mis-routing (not ERTM /ETCS related)9,114
TGDriver8,917
IBPoints failure (including no fault found)7,611
IRBroken/cracked/twisted/buckled/flawed rail7,474
ISTrack defects (other than rail defects) inc. fish plates, wet beds etc.6,179
OBDelayed by signaller not applying applicable regulating policy5,663
IFTrain Describer/Panel/ARS/SSI/TDM Remote Control failure5,155