Leaves on the Line

Long Eaton

LGE East Midlands route
CSV JSON

0 delay minutes

No delay was picked up at Long Eaton in the four weeks to 9 December 2023.

100% of them were agreed between Network Rail and the operators when the file came out on 5 Jan 2024.

By cause

Delay minutes by cause in 2023-24 P09
CauseMinutesShareNetwork-wideTrains cancelled
Network Rail's causes
Track--8%-
Signals, points and power--16%-
Weather and structures--7%-
Autumn--7%-
External--4%-
Network management--17%-
The operators' causes
Train faults--16%-
Traincrew--11%-
Stations--3%-
Operations--5%-
Operator, other--7%-

Quiet enough here (under 100 delay minutes a period on average) that comparing years would mostly be noise, so there's no comparison.

Period by period

Delay minutes a day, period by period. Gridlines every 1 minutes. Hatched periods were under 94% agreed when their file came out, so they may still move. Pick a bar to see that period.

The codes behind it

In 2023-24 P09
CodeWhat Network Rail loggedMinutes
Nothing logged.
Since 2018
CodeWhat Network Rail loggedMinutes
MDTechnical failures below the solebar30
XRCable vandalism or theft26
IHPower Supply And Distribution System Failure9
ISTrack defects (other than rail defects) inc. fish plates, wet beds etc.5
ITRough ride or bumps reported - cause not known or no fault found5
J3Axle Counter Failure4
M7Door and Door system faults4
MNBrake and brake systems faults; including wheel flats where no other cause had been identified4
IFTrain Describer/Panel/ARS/SSI/TDM Remote Control failure3
IVCutting or embankment earthslip, rock fall or subsidence (not the result of severe weather on the day of failure)3