Longton
301 delay minutes
The biggest share (35%) of the delay picked up at Longton in the four weeks to 9 December 2023 came from signal, points and power faults.
38% of these minutes were knock-on from something that happened elsewhere first. 99% of them were agreed between Network Rail and the operators when the file came out on 5 Jan 2024.
By cause
| Cause | Minutes | Share | Network-wide | A day, against the same period other years | Trains cancelled |
|---|---|---|---|---|---|
| Network Rail's causes | |||||
| Track | 7 | 2% | 8% | 0 a day, more than 2 of the other 4 years | - |
| Signals, points and power | 104 | 35% | 16% | 4 a day, more than 3 of the other 4 years | - |
| Weather and structures | - | - | 7% | 0 a day, the least in 5 years | - |
| Autumn | 17 | 6% | 7% | 1 a day, more than 1 of the other 4 years | - |
| External | 3 | <1% | 4% | 0 a day, more than 1 of the other 4 years | - |
| Network management | 80 | 27% | 17% | 3 a day, the most in 5 years | - |
| The operators' causes | |||||
| Train faults | 28 | 9% | 16% | 1 a day, more than 2 of the other 4 years | - |
| Traincrew | 25 | 8% | 11% | 1 a day, more than 2 of the other 4 years | - |
| Stations | 13 | 4% | 3% | 0 a day, more than 2 of the other 4 years | - |
| Operations | - | - | 5% | 0 a day, the least in 5 years | - |
| Operator, other | 24 | 8% | 7% | 1 a day, more than 1 of the other 4 years | - |
Period by period
The codes behind it
| Code | What Network Rail logged | Minutes |
|---|---|---|
| ID | Level crossing faults and failure incl. barrow/foot crossings and crossing treadles | 72 |
| JP | Failure to maintain vegetation within network boundaries in accordance with prevailing Network Rail standards | 30 |
| TG | Driver | 24 |
| J3 | Axle Counter Failure | 20 |
| Q1 | Takeback Pumps | 16 |
| JX | Miscellaneous items on track including litter (not including leaves, result of vandalism, weather or fallen/thrown from trains) | 14 |
| Q3 | NZ Pumps T | 13 |
| MP | Rail / wheel interface, adhesion problems (including ice on the running rail) | 12 |
| RB | Passengers joining/alighting | 9 |
| M8 | Technical failures above the Solebar | 8 |
| Code | What Network Rail logged | Minutes |
|---|---|---|
| TG | Driver | 854 |
| MD | Technical failures below the solebar | 832 |
| Q1 | Takeback Pumps | 573 |
| IA | Signal failure (including no fault found) | 536 |
| ID | Level crossing faults and failure incl. barrow/foot crossings and crossing treadles | 460 |
| IC | Track circuit failure (including no fault found) | 451 |
| XB | Vandalism or theft (including the placing of objects on the line) | 445 |
| J3 | Axle Counter Failure | 434 |
| M8 | Technical failures above the Solebar | 411 |
| IS | Track defects (other than rail defects) inc. fish plates, wet beds etc. | 409 |