Leatherhead
289 delay minutes
The biggest share (45%) of the delay picked up at Leatherhead in the four weeks to 9 December 2023 came from how the network was run.
79% of these minutes were knock-on from something that happened elsewhere first. 98% of them were agreed between Network Rail and the operators when the file came out on 5 Jan 2024.
By cause
| Cause | Minutes | Share | Network-wide | A day, against the same period other years | Trains cancelled |
|---|---|---|---|---|---|
| Network Rail's causes | |||||
| Track | 9 | 3% | 8% | 0 a day, more than 2 of the other 4 years | - |
| Signals, points and power | 21 | 7% | 16% | 1 a day, the least in 5 years | - |
| Weather and structures | - | - | 7% | 0 a day, the least in 5 years | - |
| Autumn | 61 | 21% | 7% | 2 a day, more than 3 of the other 4 years | - |
| External | - | - | 4% | 0 a day, the least in 5 years | - |
| Network management | 129 | 45% | 17% | 5 a day, more than 3 of the other 4 years | - |
| The operators' causes | |||||
| Train faults | - | - | 16% | 0 a day, the least in 5 years | - |
| Traincrew | 9 | 3% | 11% | 0 a day, the least in 5 years | - |
| Stations | 4 | 1% | 3% | 0 a day, more than 2 of the other 4 years | - |
| Operations | - | - | 5% | 0 a day, the least in 5 years | - |
| Operator, other | 56 | 19% | 7% | 2 a day, more than 2 of the other 4 years | - |
Period by period
The codes behind it
| Code | What Network Rail logged | Minutes |
|---|---|---|
| ZS | No Cause ascertainable for a Sub-Threshold Delay causing Threshold Reactionary (where agreed by both parties) | 81 |
| Q3 | NZ Pumps T | 56 |
| TT | Leaf fall Neutral | 56 |
| OC | Signaller including mis-routing (not ERTM /ETCS related) | 23 |
| IB | Points failure (including no fault found) | 11 |
| I5 | Possession over-run from planned work | 10 |
| IR | Broken/cracked/twisted/buckled/flawed rail | 9 |
| TG | Driver | 8 |
| IF | Train Describer/Panel/ARS/SSI/TDM Remote Control failure | 5 |
| QH | Adhesion problems due to leaf contamination | 5 |
| Code | What Network Rail logged | Minutes |
|---|---|---|
| ZS | No Cause ascertainable for a Sub-Threshold Delay causing Threshold Reactionary (where agreed by both parties) | 2,599 |
| IS | Track defects (other than rail defects) inc. fish plates, wet beds etc. | 2,096 |
| TG | Driver | 1,317 |
| OC | Signaller including mis-routing (not ERTM /ETCS related) | 951 |
| IB | Points failure (including no fault found) | 625 |
| IF | Train Describer/Panel/ARS/SSI/TDM Remote Control failure | 552 |
| IC | Track circuit failure (including no fault found) | 516 |
| XW | Severe weather not snow affecting infrastructure the responsibility of Network Rail | 382 |
| T2 | Delay at unstaffed station to non-DOO train | 371 |
| MN | Brake and brake systems faults; including wheel flats where no other cause had been identified | 367 |