Leaves on the Line

Leatherhead

LHD Wessex route
CSV JSON

289 delay minutes

The biggest share (45%) of the delay picked up at Leatherhead in the four weeks to 9 December 2023 came from how the network was run.

79% of these minutes were knock-on from something that happened elsewhere first. 98% of them were agreed between Network Rail and the operators when the file came out on 5 Jan 2024.

By cause

Delay minutes by cause in 2023-24 P09
CauseMinutesShareNetwork-wideA day, against the same period other yearsTrains cancelled
Network Rail's causes
Track93%8% 0 a day, more than 2 of the other 4 years-
Signals, points and power217%16% 1 a day, the least in 5 years-
Weather and structures--7% 0 a day, the least in 5 years-
Autumn6121%7% 2 a day, more than 3 of the other 4 years-
External--4% 0 a day, the least in 5 years-
Network management12945%17% 5 a day, more than 3 of the other 4 years-
The operators' causes
Train faults--16% 0 a day, the least in 5 years-
Traincrew93%11% 0 a day, the least in 5 years-
Stations41%3% 0 a day, more than 2 of the other 4 years-
Operations--5% 0 a day, the least in 5 years-
Operator, other5619%7% 2 a day, more than 2 of the other 4 years-

Period by period

Delay minutes a day, period by period. Gridlines every 10 minutes. Hatched periods were under 94% agreed when their file came out, so they may still move. Pick a bar to see that period.

The codes behind it

In 2023-24 P09
CodeWhat Network Rail loggedMinutes
ZSNo Cause ascertainable for a Sub-Threshold Delay causing Threshold Reactionary (where agreed by both parties)81
Q3NZ Pumps T56
TTLeaf fall Neutral56
OCSignaller including mis-routing (not ERTM /ETCS related)23
IBPoints failure (including no fault found)11
I5Possession over-run from planned work10
IRBroken/cracked/twisted/buckled/flawed rail9
TGDriver8
IFTrain Describer/Panel/ARS/SSI/TDM Remote Control failure5
QHAdhesion problems due to leaf contamination5
Since 2018
CodeWhat Network Rail loggedMinutes
ZSNo Cause ascertainable for a Sub-Threshold Delay causing Threshold Reactionary (where agreed by both parties)2,599
ISTrack defects (other than rail defects) inc. fish plates, wet beds etc.2,096
TGDriver1,317
OCSignaller including mis-routing (not ERTM /ETCS related)951
IBPoints failure (including no fault found)625
IFTrain Describer/Panel/ARS/SSI/TDM Remote Control failure552
ICTrack circuit failure (including no fault found)516
XWSevere weather not snow affecting infrastructure the responsibility of Network Rail382
T2Delay at unstaffed station to non-DOO train371
MNBrake and brake systems faults; including wheel flats where no other cause had been identified367