273 delay minutes

The biggest share (45%) of the delay picked up at Limehouse in the four weeks to 9 December 2023 came from how the network was run.

76% of these minutes were knock-on from something that happened elsewhere first. 100% of them were agreed between Network Rail and the operators when the file came out on 5 Jan 2024.

By cause

Delay minutes by cause in 2023-24 P09
CauseMinutesShareNetwork-wideA day, against the same period other yearsTrains cancelled
Network Rail's causes
Track52%8% 0 a day, more than 1 of the other 4 years-
Signals, points and power2<1%16% 0 a day, more than 1 of the other 4 years-
Weather and structures--7% 0 a day, the least in 5 years-
Autumn--7% 0 a day, the least in 5 years-
External--4% 0 a day, the least in 5 years-
Network management12245%17% 4 a day, the most in 5 years-
The operators' causes
Train faults135%16% 0 a day, the least in 5 years-
Traincrew9736%11% 3 a day, the most in 5 years-
Stations--3% 0 a day, the least in 5 years-
Operations62%5% 0 a day, more than 3 of the other 4 years-
Operator, other2911%7% 1 a day, more than 3 of the other 4 years-

Period by period

Delay minutes a day, period by period. Gridlines every 10 minutes. Hatched periods were under 94% agreed when their file came out, so they may still move. Pick a bar to see that period.

The codes behind it

In 2023-24 P09
CodeWhat Network Rail loggedMinutes
TGDriver88
JXMiscellaneous items on track including litter (not including leaves, result of vandalism, weather or fallen/thrown from trains)57
OHARS / TMS / SARS software problem (excluding scheduling issues and technical failures)47
VHPassenger Communication cord, door egress or emergency train alarm operated29
JLSafety related incident caused by maintenance or infrastructure staff oversight or error (not Operations staff)9
MDTechnical failures below the solebar7
FCFreight Train Driver error, SPAD, Wrong routing or Missed AWS/DSD [No change]6
ISTrack defects (other than rail defects) inc. fish plates, wet beds etc.5
OKDelay caused by Operating staff oversight, issues or absence (excluding signallers and Control)5
TZOther Passenger Train Operating Company causes4
Since 2018
CodeWhat Network Rail loggedMinutes
ISTrack defects (other than rail defects) inc. fish plates, wet beds etc.1,376
TGDriver1,085
JATSR speed restrictions for track work outside of the Timetable Planning Rules1,017
OHARS / TMS / SARS software problem (excluding scheduling issues and technical failures)837
I8Animal Strike or Incursion within the control of Network Rail750
M8Technical failures above the Solebar655
JHCritical Rail Temperature speeds, (other than buckled rails)496
M7Door and Door system faults470
IFTrain Describer/Panel/ARS/SSI/TDM Remote Control failure444
RBPassengers joining/alighting432