Limehouse
273 delay minutes
The biggest share (45%) of the delay picked up at Limehouse in the four weeks to 9 December 2023 came from how the network was run.
76% of these minutes were knock-on from something that happened elsewhere first. 100% of them were agreed between Network Rail and the operators when the file came out on 5 Jan 2024.
By cause
| Cause | Minutes | Share | Network-wide | A day, against the same period other years | Trains cancelled |
|---|---|---|---|---|---|
| Network Rail's causes | |||||
| Track | 5 | 2% | 8% | 0 a day, more than 1 of the other 4 years | - |
| Signals, points and power | 2 | <1% | 16% | 0 a day, more than 1 of the other 4 years | - |
| Weather and structures | - | - | 7% | 0 a day, the least in 5 years | - |
| Autumn | - | - | 7% | 0 a day, the least in 5 years | - |
| External | - | - | 4% | 0 a day, the least in 5 years | - |
| Network management | 122 | 45% | 17% | 4 a day, the most in 5 years | - |
| The operators' causes | |||||
| Train faults | 13 | 5% | 16% | 0 a day, the least in 5 years | - |
| Traincrew | 97 | 36% | 11% | 3 a day, the most in 5 years | - |
| Stations | - | - | 3% | 0 a day, the least in 5 years | - |
| Operations | 6 | 2% | 5% | 0 a day, more than 3 of the other 4 years | - |
| Operator, other | 29 | 11% | 7% | 1 a day, more than 3 of the other 4 years | - |
Period by period
The codes behind it
| Code | What Network Rail logged | Minutes |
|---|---|---|
| TG | Driver | 88 |
| JX | Miscellaneous items on track including litter (not including leaves, result of vandalism, weather or fallen/thrown from trains) | 57 |
| OH | ARS / TMS / SARS software problem (excluding scheduling issues and technical failures) | 47 |
| VH | Passenger Communication cord, door egress or emergency train alarm operated | 29 |
| JL | Safety related incident caused by maintenance or infrastructure staff oversight or error (not Operations staff) | 9 |
| MD | Technical failures below the solebar | 7 |
| FC | Freight Train Driver error, SPAD, Wrong routing or Missed AWS/DSD [No change] | 6 |
| IS | Track defects (other than rail defects) inc. fish plates, wet beds etc. | 5 |
| OK | Delay caused by Operating staff oversight, issues or absence (excluding signallers and Control) | 5 |
| TZ | Other Passenger Train Operating Company causes | 4 |
| Code | What Network Rail logged | Minutes |
|---|---|---|
| IS | Track defects (other than rail defects) inc. fish plates, wet beds etc. | 1,376 |
| TG | Driver | 1,085 |
| JA | TSR speed restrictions for track work outside of the Timetable Planning Rules | 1,017 |
| OH | ARS / TMS / SARS software problem (excluding scheduling issues and technical failures) | 837 |
| I8 | Animal Strike or Incursion within the control of Network Rail | 750 |
| M8 | Technical failures above the Solebar | 655 |
| JH | Critical Rail Temperature speeds, (other than buckled rails) | 496 |
| M7 | Door and Door system faults | 470 |
| IF | Train Describer/Panel/ARS/SSI/TDM Remote Control failure | 444 |
| RB | Passengers joining/alighting | 432 |