Lichfield City
412 delay minutes
The biggest share (39%) of the delay picked up at Lichfield City in the four weeks to 9 December 2023 came from signal, points and power faults.
32% of these minutes were knock-on from something that happened elsewhere first. 99% of them were agreed between Network Rail and the operators when the file came out on 5 Jan 2024.
By cause
| Cause | Minutes | Share | Network-wide | A day, against the same period other years | Trains cancelled |
|---|---|---|---|---|---|
| Network Rail's causes | |||||
| Track | 3 | <1% | 8% | 0 a day, more than 2 of the other 4 years | - |
| Signals, points and power | 160 | 39% | 16% | 6 a day, more than 3 of the other 4 years | - |
| Weather and structures | 6 | 1% | 7% | 0 a day, more than 2 of the other 4 years | - |
| Autumn | 54 | 13% | 7% | 2 a day, more than 3 of the other 4 years | - |
| External | 28 | 7% | 4% | 1 a day, more than 3 of the other 4 years | 5 |
| Network management | 15 | 4% | 17% | 1 a day, the least in 5 years | 14 |
| The operators' causes | |||||
| Train faults | 54 | 13% | 16% | 2 a day, more than 2 of the other 4 years | 2 |
| Traincrew | 23 | 6% | 11% | 1 a day, more than 2 of the other 4 years | 1 |
| Stations | 17 | 4% | 3% | 1 a day, more than 1 of the other 4 years | - |
| Operations | 1 | <1% | 5% | 0 a day, more than 1 of the other 4 years | - |
| Operator, other | 52 | 13% | 7% | 2 a day, more than 2 of the other 4 years | - |
Period by period
The codes behind it
| Code | What Network Rail logged | Minutes |
|---|---|---|
| IC | Track circuit failure (including no fault found) | 120 |
| Q3 | NZ Pumps T | 49 |
| TT | Leaf fall Neutral | 29 |
| XO | External trees, building or structures encroaching or falling onto network infrastructure (not weather or vandalism) | 28 |
| IF | Train Describer/Panel/ARS/SSI/TDM Remote Control failure | 26 |
| MD | Technical failures below the solebar | 26 |
| M8 | Technical failures above the Solebar | 22 |
| TG | Driver | 21 |
| MP | Rail / wheel interface, adhesion problems (including ice on the running rail) | 20 |
| RQ | Un-booked assistance for a person with reduced mobility joining/alighting, | 14 |
| Code | What Network Rail logged | Minutes |
|---|---|---|
| JS | Condition of Track TSR outside the Timetable Planning Rules | 2,977 |
| TG | Driver | 1,251 |
| IC | Track circuit failure (including no fault found) | 1,245 |
| ZU | No Cause Identified After investigation by both Parties | 988 |
| TH | (Senior) Conductor/Train Manager | 905 |
| IF | Train Describer/Panel/ARS/SSI/TDM Remote Control failure | 835 |
| ZS | No Cause ascertainable for a Sub-Threshold Delay causing Threshold Reactionary (where agreed by both parties) | 814 |
| MD | Technical failures below the solebar | 730 |
| XP | BRIDGE HIT | 656 |
| IS | Track defects (other than rail defects) inc. fish plates, wet beds etc. | 588 |