Leaves on the Line

Lichfield City

LIC Central route
CSV JSON

412 delay minutes

The biggest share (39%) of the delay picked up at Lichfield City in the four weeks to 9 December 2023 came from signal, points and power faults.

32% of these minutes were knock-on from something that happened elsewhere first. 99% of them were agreed between Network Rail and the operators when the file came out on 5 Jan 2024.

By cause

Delay minutes by cause in 2023-24 P09
CauseMinutesShareNetwork-wideA day, against the same period other yearsTrains cancelled
Network Rail's causes
Track3<1%8% 0 a day, more than 2 of the other 4 years-
Signals, points and power16039%16% 6 a day, more than 3 of the other 4 years-
Weather and structures61%7% 0 a day, more than 2 of the other 4 years-
Autumn5413%7% 2 a day, more than 3 of the other 4 years-
External287%4% 1 a day, more than 3 of the other 4 years5
Network management154%17% 1 a day, the least in 5 years14
The operators' causes
Train faults5413%16% 2 a day, more than 2 of the other 4 years2
Traincrew236%11% 1 a day, more than 2 of the other 4 years1
Stations174%3% 1 a day, more than 1 of the other 4 years-
Operations1<1%5% 0 a day, more than 1 of the other 4 years-
Operator, other5213%7% 2 a day, more than 2 of the other 4 years-

Period by period

Delay minutes a day, period by period. Gridlines every 20 minutes. Hatched periods were under 94% agreed when their file came out, so they may still move. Pick a bar to see that period.

The codes behind it

In 2023-24 P09
CodeWhat Network Rail loggedMinutes
ICTrack circuit failure (including no fault found)120
Q3NZ Pumps T49
TTLeaf fall Neutral29
XOExternal trees, building or structures encroaching or falling onto network infrastructure (not weather or vandalism)28
IFTrain Describer/Panel/ARS/SSI/TDM Remote Control failure26
MDTechnical failures below the solebar26
M8Technical failures above the Solebar22
TGDriver21
MPRail / wheel interface, adhesion problems (including ice on the running rail)20
RQUn-booked assistance for a person with reduced mobility joining/alighting,14
Since 2018
CodeWhat Network Rail loggedMinutes
JSCondition of Track TSR outside the Timetable Planning Rules2,977
TGDriver1,251
ICTrack circuit failure (including no fault found)1,245
ZUNo Cause Identified After investigation by both Parties988
TH(Senior) Conductor/Train Manager905
IFTrain Describer/Panel/ARS/SSI/TDM Remote Control failure835
ZSNo Cause ascertainable for a Sub-Threshold Delay causing Threshold Reactionary (where agreed by both parties)814
MDTechnical failures below the solebar730
XPBRIDGE HIT656
ISTrack defects (other than rail defects) inc. fish plates, wet beds etc.588