Lichfield Trent Valley High Level
0 delay minutes
No delay was picked up at Lichfield Trent Valley High Level in the four weeks to 9 December 2023.
100% of them were agreed between Network Rail and the operators when the file came out on 5 Jan 2024.
By cause
| Cause | Minutes | Share | Network-wide | A day, against the same period other years | Trains cancelled |
|---|---|---|---|---|---|
| Network Rail's causes | |||||
| Track | - | - | 8% | 0 a day, the least in 5 years | - |
| Signals, points and power | - | - | 16% | 0 a day, the least in 5 years | - |
| Weather and structures | - | - | 7% | 0 a day, the least in 5 years | - |
| Autumn | - | - | 7% | 0 a day, the least in 5 years | - |
| External | - | - | 4% | 0 a day, the least in 5 years | 1 |
| Network management | - | - | 17% | 0 a day, the least in 5 years | - |
| The operators' causes | |||||
| Train faults | - | - | 16% | 0 a day, the least in 5 years | - |
| Traincrew | - | - | 11% | 0 a day, the least in 5 years | - |
| Stations | - | - | 3% | 0 a day, the least in 5 years | - |
| Operations | - | - | 5% | 0 a day, the least in 5 years | - |
| Operator, other | - | - | 7% | 0 a day, the least in 5 years | - |
Period by period
The codes behind it
| Code | What Network Rail logged | Minutes |
|---|---|---|
| Nothing logged. | ||
| Code | What Network Rail logged | Minutes |
|---|---|---|
| TG | Driver | 2,060 |
| ZS | No Cause ascertainable for a Sub-Threshold Delay causing Threshold Reactionary (where agreed by both parties) | 1,643 |
| TH | (Senior) Conductor/Train Manager | 1,409 |
| ZU | No Cause Identified After investigation by both Parties | 1,379 |
| IS | Track defects (other than rail defects) inc. fish plates, wet beds etc. | 1,177 |
| IB | Points failure (including no fault found) | 1,008 |
| MD | Technical failures below the solebar | 886 |
| OC | Signaller including mis-routing (not ERTM /ETCS related) | 714 |
| IF | Train Describer/Panel/ARS/SSI/TDM Remote Control failure | 671 |
| M8 | Technical failures above the Solebar | 586 |