Liverpool Lime Street
10,091 delay minutes
The biggest share (29%) of the delay picked up at Liverpool Lime Street in the four weeks to 9 December 2023 came from signal, points and power faults.
75% of these minutes were knock-on from something that happened elsewhere first. 89% of them were agreed between Network Rail and the operators when the file came out on 5 Jan 2024, so they may still move.
By cause
| Cause | Minutes | Share | Network-wide | A day, against the same period other years | Trains cancelled |
|---|---|---|---|---|---|
| Network Rail's causes | |||||
| Track | 549 | 5% | 8% | 20 a day, the most in 5 years | 4 |
| Signals, points and power | 2,950 | 29% | 16% | 105 a day, the most in 5 years | 15 |
| Weather and structures | 667 | 7% | 7% | 24 a day, more than 3 of the other 4 years | 16 |
| Autumn | 298 | 3% | 7% | 11 a day, more than 2 of the other 4 years | 1 |
| External | 387 | 4% | 4% | 14 a day, more than 3 of the other 4 years | - |
| Network management | 764 | 8% | 17% | 27 a day, more than 2 of the other 4 years | 100 |
| The operators' causes | |||||
| Train faults | 1,429 | 14% | 16% | 51 a day, more than 3 of the other 4 years | 29 |
| Traincrew | 1,744 | 17% | 11% | 62 a day, more than 3 of the other 4 years | 131 |
| Stations | 199 | 2% | 3% | 7 a day, more than 1 of the other 4 years | - |
| Operations | 701 | 7% | 5% | 25 a day, more than 3 of the other 4 years | 12 |
| Operator, other | 405 | 4% | 7% | 14 a day, more than 2 of the other 4 years | 6 |
Period by period
The codes behind it
| Code | What Network Rail logged | Minutes |
|---|---|---|
| IC | Track circuit failure (including no fault found) | 1,058 |
| TG | Driver | 1,048 |
| II | Signalling lineside cable fault | 800 |
| TH | (Senior) Conductor/Train Manager | 558 |
| XW | Severe weather not snow affecting infrastructure the responsibility of Network Rail | 523 |
| IS | Track defects (other than rail defects) inc. fish plates, wet beds etc. | 410 |
| M8 | Technical failures above the Solebar | 376 |
| IH | Power Supply And Distribution System Failure | 343 |
| TZ | Other Passenger Train Operating Company causes | 310 |
| XP | BRIDGE HIT | 293 |
| Code | What Network Rail logged | Minutes |
|---|---|---|
| TG | Driver | 44,051 |
| MD | Technical failures below the solebar | 19,944 |
| TH | (Senior) Conductor/Train Manager | 13,537 |
| M8 | Technical failures above the Solebar | 11,902 |
| M7 | Door and Door system faults | 10,514 |
| IB | Points failure (including no fault found) | 8,873 |
| MN | Brake and brake systems faults; including wheel flats where no other cause had been identified | 8,697 |
| MS | Planned underpowered or shortformed service and or vehicle, incl. exam set swaps | 8,609 |
| IC | Track circuit failure (including no fault found) | 5,685 |
| I1 | Overhead line/third rail defect | 5,215 |