10,091 delay minutes

The biggest share (29%) of the delay picked up at Liverpool Lime Street in the four weeks to 9 December 2023 came from signal, points and power faults.

75% of these minutes were knock-on from something that happened elsewhere first. 89% of them were agreed between Network Rail and the operators when the file came out on 5 Jan 2024, so they may still move.

By cause

Delay minutes by cause in 2023-24 P09
CauseMinutesShareNetwork-wideA day, against the same period other yearsTrains cancelled
Network Rail's causes
Track5495%8% 20 a day, the most in 5 years4
Signals, points and power2,95029%16% 105 a day, the most in 5 years15
Weather and structures6677%7% 24 a day, more than 3 of the other 4 years16
Autumn2983%7% 11 a day, more than 2 of the other 4 years1
External3874%4% 14 a day, more than 3 of the other 4 years-
Network management7648%17% 27 a day, more than 2 of the other 4 years100
The operators' causes
Train faults1,42914%16% 51 a day, more than 3 of the other 4 years29
Traincrew1,74417%11% 62 a day, more than 3 of the other 4 years131
Stations1992%3% 7 a day, more than 1 of the other 4 years-
Operations7017%5% 25 a day, more than 3 of the other 4 years12
Operator, other4054%7% 14 a day, more than 2 of the other 4 years6

Period by period

Delay minutes a day, period by period. Gridlines every 100 minutes. Hatched periods were under 94% agreed when their file came out, so they may still move. Pick a bar to see that period.

The codes behind it

In 2023-24 P09
CodeWhat Network Rail loggedMinutes
ICTrack circuit failure (including no fault found)1,058
TGDriver1,048
IISignalling lineside cable fault800
TH(Senior) Conductor/Train Manager558
XWSevere weather not snow affecting infrastructure the responsibility of Network Rail523
ISTrack defects (other than rail defects) inc. fish plates, wet beds etc.410
M8Technical failures above the Solebar376
IHPower Supply And Distribution System Failure343
TZOther Passenger Train Operating Company causes310
XPBRIDGE HIT293
Since 2018
CodeWhat Network Rail loggedMinutes
TGDriver44,051
MDTechnical failures below the solebar19,944
TH(Senior) Conductor/Train Manager13,537
M8Technical failures above the Solebar11,902
M7Door and Door system faults10,514
IBPoints failure (including no fault found)8,873
MNBrake and brake systems faults; including wheel flats where no other cause had been identified8,697
MSPlanned underpowered or shortformed service and or vehicle, incl. exam set swaps8,609
ICTrack circuit failure (including no fault found)5,685
I1Overhead line/third rail defect5,215