Leaves on the Line

Longbridge

LOB Central route
CSV JSON

1,488 delay minutes

The biggest share (18%) of the delay picked up at Longbridge in the four weeks to 9 December 2023 came from signal, points and power faults.

79% of these minutes were knock-on from something that happened elsewhere first. 99% of them were agreed between Network Rail and the operators when the file came out on 5 Jan 2024.

By cause

Delay minutes by cause in 2023-24 P09
CauseMinutesShareNetwork-wideA day, against the same period other yearsTrains cancelled
Network Rail's causes
Track675%8% 2 a day, more than 2 of the other 4 years2
Signals, points and power27218%16% 10 a day, more than 2 of the other 4 years8
Weather and structures705%7% 3 a day, more than 1 of the other 4 years-
Autumn564%7% 2 a day, more than 3 of the other 4 years-
External18512%4% 7 a day, the most in 5 years-
Network management25417%17% 9 a day, more than 2 of the other 4 years3
The operators' causes
Train faults17011%16% 6 a day, more than 2 of the other 4 years1
Traincrew16311%11% 6 a day, more than 2 of the other 4 years1
Stations1158%3% 4 a day, the most in 5 years-
Operations413%5% 1 a day, more than 2 of the other 4 years-
Operator, other966%7% 3 a day, more than 3 of the other 4 years1

Period by period

Delay minutes a day, period by period. Gridlines every 20 minutes. Hatched periods were under 94% agreed when their file came out, so they may still move. Pick a bar to see that period.

The codes behind it

In 2023-24 P09
CodeWhat Network Rail loggedMinutes
XOExternal trees, building or structures encroaching or falling onto network infrastructure (not weather or vandalism)170
IBPoints failure (including no fault found)146
TGDriver130
RQUn-booked assistance for a person with reduced mobility joining/alighting,55
MDTechnical failures below the solebar53
ZSNo Cause ascertainable for a Sub-Threshold Delay causing Threshold Reactionary (where agreed by both parties)53
ISTrack defects (other than rail defects) inc. fish plates, wet beds etc.52
JPFailure to maintain vegetation within network boundaries in accordance with prevailing Network Rail standards46
MNBrake and brake systems faults; including wheel flats where no other cause had been identified40
IFTrain Describer/Panel/ARS/SSI/TDM Remote Control failure38
Since 2018
CodeWhat Network Rail loggedMinutes
TGDriver4,428
ISTrack defects (other than rail defects) inc. fish plates, wet beds etc.3,761
ZSNo Cause ascertainable for a Sub-Threshold Delay causing Threshold Reactionary (where agreed by both parties)2,826
IBPoints failure (including no fault found)2,773
ZUNo Cause Identified After investigation by both Parties2,667
MDTechnical failures below the solebar2,618
ICTrack circuit failure (including no fault found)2,363
JPFailure to maintain vegetation within network boundaries in accordance with prevailing Network Rail standards2,268
TH(Senior) Conductor/Train Manager2,033
M8Technical failures above the Solebar1,701