1,488 delay minutes
The biggest share (18%) of the delay picked up at Longbridge in the four weeks to 9 December 2023 came from signal, points and power faults.
79% of these minutes were knock-on from something that happened elsewhere first. 99% of them were agreed between Network Rail and the operators when the file came out on 5 Jan 2024.
By cause
| Cause | Minutes | Share | Network-wide | A day, against the same period other years | Trains cancelled |
|---|---|---|---|---|---|
| Network Rail's causes | |||||
| Track | 67 | 5% | 8% | 2 a day, more than 2 of the other 4 years | 2 |
| Signals, points and power | 272 | 18% | 16% | 10 a day, more than 2 of the other 4 years | 8 |
| Weather and structures | 70 | 5% | 7% | 3 a day, more than 1 of the other 4 years | - |
| Autumn | 56 | 4% | 7% | 2 a day, more than 3 of the other 4 years | - |
| External | 185 | 12% | 4% | 7 a day, the most in 5 years | - |
| Network management | 254 | 17% | 17% | 9 a day, more than 2 of the other 4 years | 3 |
| The operators' causes | |||||
| Train faults | 170 | 11% | 16% | 6 a day, more than 2 of the other 4 years | 1 |
| Traincrew | 163 | 11% | 11% | 6 a day, more than 2 of the other 4 years | 1 |
| Stations | 115 | 8% | 3% | 4 a day, the most in 5 years | - |
| Operations | 41 | 3% | 5% | 1 a day, more than 2 of the other 4 years | - |
| Operator, other | 96 | 6% | 7% | 3 a day, more than 3 of the other 4 years | 1 |
Period by period
The codes behind it
| Code | What Network Rail logged | Minutes |
|---|---|---|
| XO | External trees, building or structures encroaching or falling onto network infrastructure (not weather or vandalism) | 170 |
| IB | Points failure (including no fault found) | 146 |
| TG | Driver | 130 |
| RQ | Un-booked assistance for a person with reduced mobility joining/alighting, | 55 |
| MD | Technical failures below the solebar | 53 |
| ZS | No Cause ascertainable for a Sub-Threshold Delay causing Threshold Reactionary (where agreed by both parties) | 53 |
| IS | Track defects (other than rail defects) inc. fish plates, wet beds etc. | 52 |
| JP | Failure to maintain vegetation within network boundaries in accordance with prevailing Network Rail standards | 46 |
| MN | Brake and brake systems faults; including wheel flats where no other cause had been identified | 40 |
| IF | Train Describer/Panel/ARS/SSI/TDM Remote Control failure | 38 |
| Code | What Network Rail logged | Minutes |
|---|---|---|
| TG | Driver | 4,428 |
| IS | Track defects (other than rail defects) inc. fish plates, wet beds etc. | 3,761 |
| ZS | No Cause ascertainable for a Sub-Threshold Delay causing Threshold Reactionary (where agreed by both parties) | 2,826 |
| IB | Points failure (including no fault found) | 2,773 |
| ZU | No Cause Identified After investigation by both Parties | 2,667 |
| MD | Technical failures below the solebar | 2,618 |
| IC | Track circuit failure (including no fault found) | 2,363 |
| JP | Failure to maintain vegetation within network boundaries in accordance with prevailing Network Rail standards | 2,268 |
| TH | (Senior) Conductor/Train Manager | 2,033 |
| M8 | Technical failures above the Solebar | 1,701 |