Looe
128 delay minutes
The biggest share (27%) of the delay picked up at Looe in the four weeks to 9 December 2023 came from traincrew problems.
43% of these minutes were knock-on from something that happened elsewhere first. 95% of them were agreed between Network Rail and the operators when the file came out on 5 Jan 2024.
By cause
| Cause | Minutes | Share | Network-wide | Trains cancelled |
|---|---|---|---|---|
| Network Rail's causes | ||||
| Track | 7 | 5% | 8% | 2 |
| Signals, points and power | 4 | 3% | 16% | - |
| Weather and structures | 7 | 5% | 7% | 30 |
| Autumn | 15 | 12% | 7% | - |
| External | 2 | 2% | 4% | - |
| Network management | 24 | 19% | 17% | 2 |
| The operators' causes | ||||
| Train faults | 11 | 9% | 16% | - |
| Traincrew | 34 | 27% | 11% | 5 |
| Stations | - | - | 3% | - |
| Operations | 3 | 2% | 5% | - |
| Operator, other | 21 | 16% | 7% | - |
Quiet enough here (under 100 delay minutes a period on average) that comparing years would mostly be noise, so there's no comparison.
Period by period
The codes behind it
| Code | What Network Rail logged | Minutes |
|---|---|---|
| TG | Driver | 34 |
| OU | Delays not Investigated by Network Rail | 18 |
| Q3 | NZ Pumps T | 15 |
| TT | Leaf fall Neutral | 15 |
| IR | Broken/cracked/twisted/buckled/flawed rail | 7 |
| M8 | Technical failures above the Solebar | 7 |
| X2 | Severe flooding beyond that which could be mitigated on Network Rail infrastructure | 7 |
| VZ | Other passenger or external causes the responsibility of TOC | 6 |
| IA | Signal failure (including no fault found) | 4 |
| M7 | Door and Door system faults | 4 |
| Code | What Network Rail logged | Minutes |
|---|---|---|
| ZU | No Cause Identified After investigation by both Parties | 860 |
| TG | Driver | 729 |
| JD | Structures - Bridges/tunnels/buildings/retaining walls/sea defences (not bridge strikes) | 495 |
| MD | Technical failures below the solebar | 347 |
| IL | Token equipment failure (including no fault found) | 294 |
| M7 | Door and Door system faults | 246 |
| JP | Failure to maintain vegetation within network boundaries in accordance with prevailing Network Rail standards | 227 |
| ZY | Univestigated station overtime System Roll-up Only | 214 |
| MN | Brake and brake systems faults; including wheel flats where no other cause had been identified | 206 |
| RB | Passengers joining/alighting | 199 |