Leaves on the Line

Lowdham

LOW East Midlands route
CSV JSON

1,098 delay minutes

The biggest share (35%) of the delay picked up at Lowdham in the four weeks to 9 December 2023 came from faulty trains.

56% of these minutes were knock-on from something that happened elsewhere first. 95% of them were agreed between Network Rail and the operators when the file came out on 5 Jan 2024.

By cause

Delay minutes by cause in 2023-24 P09
CauseMinutesShareNetwork-wideA day, against the same period other yearsTrains cancelled
Network Rail's causes
Track232%8% 1 a day, more than 3 of the other 4 years-
Signals, points and power11510%16% 4 a day, more than 3 of the other 4 years-
Weather and structures10<1%7% 0 a day, more than 3 of the other 4 years-
Autumn31128%7% 11 a day, the most in 5 years-
External333%4% 1 a day, the most in 5 years-
Network management232%17% 1 a day, the least in 5 years-
The operators' causes
Train faults38835%16% 14 a day, the most in 5 years-
Traincrew121%11% 0 a day, the least in 5 years-
Stations222%3% 1 a day, the most in 5 years-
Operations111%5% 0 a day, more than 3 of the other 4 years-
Operator, other15114%7% 5 a day, the most in 5 years-

Period by period

Delay minutes a day, period by period. Gridlines every 10 minutes. Hatched periods were under 94% agreed when their file came out, so they may still move. Pick a bar to see that period.

The codes behind it

In 2023-24 P09
CodeWhat Network Rail loggedMinutes
MDTechnical failures below the solebar308
QJSpecial working for leaf-fall track circuit operation167
Q3NZ Pumps T133
TTLeaf fall Neutral126
M8Technical failures above the Solebar38
IESignalling Functional Power Supply Failure33
XNRoad or crossing related incidents inc. cars on line, crossing misuse and priority to emergency services (NOT bridge strikes)24
IASignal failure (including no fault found)22
IDLevel crossing faults and failure incl. barrow/foot crossings and crossing treadles19
IFTrain Describer/Panel/ARS/SSI/TDM Remote Control failure16
Since 2018
CodeWhat Network Rail loggedMinutes
MDTechnical failures below the solebar1,462
IDLevel crossing faults and failure incl. barrow/foot crossings and crossing treadles1,433
TGDriver1,321
Q3NZ Pumps T914
TTLeaf fall Neutral789
M8Technical failures above the Solebar735
Q1Takeback Pumps675
QMTrain schedule/STP Process including erroneous simplifiers665
JXMiscellaneous items on track including litter (not including leaves, result of vandalism, weather or fallen/thrown from trains)649
IFTrain Describer/Panel/ARS/SSI/TDM Remote Control failure531