Lowdham
1,098 delay minutes
The biggest share (35%) of the delay picked up at Lowdham in the four weeks to 9 December 2023 came from faulty trains.
56% of these minutes were knock-on from something that happened elsewhere first. 95% of them were agreed between Network Rail and the operators when the file came out on 5 Jan 2024.
By cause
| Cause | Minutes | Share | Network-wide | A day, against the same period other years | Trains cancelled |
|---|---|---|---|---|---|
| Network Rail's causes | |||||
| Track | 23 | 2% | 8% | 1 a day, more than 3 of the other 4 years | - |
| Signals, points and power | 115 | 10% | 16% | 4 a day, more than 3 of the other 4 years | - |
| Weather and structures | 10 | <1% | 7% | 0 a day, more than 3 of the other 4 years | - |
| Autumn | 311 | 28% | 7% | 11 a day, the most in 5 years | - |
| External | 33 | 3% | 4% | 1 a day, the most in 5 years | - |
| Network management | 23 | 2% | 17% | 1 a day, the least in 5 years | - |
| The operators' causes | |||||
| Train faults | 388 | 35% | 16% | 14 a day, the most in 5 years | - |
| Traincrew | 12 | 1% | 11% | 0 a day, the least in 5 years | - |
| Stations | 22 | 2% | 3% | 1 a day, the most in 5 years | - |
| Operations | 11 | 1% | 5% | 0 a day, more than 3 of the other 4 years | - |
| Operator, other | 151 | 14% | 7% | 5 a day, the most in 5 years | - |
Period by period
The codes behind it
| Code | What Network Rail logged | Minutes |
|---|---|---|
| MD | Technical failures below the solebar | 308 |
| QJ | Special working for leaf-fall track circuit operation | 167 |
| Q3 | NZ Pumps T | 133 |
| TT | Leaf fall Neutral | 126 |
| M8 | Technical failures above the Solebar | 38 |
| IE | Signalling Functional Power Supply Failure | 33 |
| XN | Road or crossing related incidents inc. cars on line, crossing misuse and priority to emergency services (NOT bridge strikes) | 24 |
| IA | Signal failure (including no fault found) | 22 |
| ID | Level crossing faults and failure incl. barrow/foot crossings and crossing treadles | 19 |
| IF | Train Describer/Panel/ARS/SSI/TDM Remote Control failure | 16 |
| Code | What Network Rail logged | Minutes |
|---|---|---|
| MD | Technical failures below the solebar | 1,462 |
| ID | Level crossing faults and failure incl. barrow/foot crossings and crossing treadles | 1,433 |
| TG | Driver | 1,321 |
| Q3 | NZ Pumps T | 914 |
| TT | Leaf fall Neutral | 789 |
| M8 | Technical failures above the Solebar | 735 |
| Q1 | Takeback Pumps | 675 |
| QM | Train schedule/STP Process including erroneous simplifiers | 665 |
| JX | Miscellaneous items on track including litter (not including leaves, result of vandalism, weather or fallen/thrown from trains) | 649 |
| IF | Train Describer/Panel/ARS/SSI/TDM Remote Control failure | 531 |