Liverpool South Parkway
9 delay minutes
Most of the delay picked up at Liverpool South Parkway in the four weeks to 9 December 2023 came from faulty trains.
100% of these minutes were knock-on from something that happened elsewhere first. 100% of them were agreed between Network Rail and the operators when the file came out on 5 Jan 2024.
By cause
| Cause | Minutes | Share | Network-wide | Trains cancelled |
|---|---|---|---|---|
| Network Rail's causes | ||||
| Track | - | - | 8% | - |
| Signals, points and power | - | - | 16% | - |
| Weather and structures | - | - | 7% | - |
| Autumn | - | - | 7% | - |
| External | - | - | 4% | - |
| Network management | - | - | 17% | - |
| The operators' causes | ||||
| Train faults | 9 | 100% | 16% | 1 |
| Traincrew | - | - | 11% | - |
| Stations | - | - | 3% | - |
| Operations | - | - | 5% | - |
| Operator, other | - | - | 7% | - |
Quiet enough here (under 100 delay minutes a period on average) that comparing years would mostly be noise, so there's no comparison.
Period by period
The codes behind it
| Code | What Network Rail logged | Minutes |
|---|---|---|
| M7 | Door and Door system faults | 9 |
| Code | What Network Rail logged | Minutes |
|---|---|---|
| IC | Track circuit failure (including no fault found) | 307 |
| MN | Brake and brake systems faults; including wheel flats where no other cause had been identified | 235 |
| MD | Technical failures below the solebar | 183 |
| IB | Points failure (including no fault found) | 177 |
| R7 | Station delays as a result of overcrowding due to planned events (e.g. sports fixtures, concerts) | 146 |
| TH | (Senior) Conductor/Train Manager | 123 |
| XB | Vandalism or theft (including the placing of objects on the line) | 98 |
| TO | Time lost en-route believed to be Operator cause and information required form operatore (Ops Responsibility) | 86 |
| IK | Telecom equipment failure (including no fault found) | 78 |
| M7 | Door and Door system faults | 75 |