Liverpool Central Loop Line

LVC North West route
CSV JSON

1,355 delay minutes

Most of the delay picked up at Liverpool Central Loop Line in the four weeks to 9 December 2023 came from faulty trains.

79% of these minutes were knock-on from something that happened elsewhere first. 100% of them were agreed between Network Rail and the operators when the file came out on 5 Jan 2024.

By cause

Delay minutes by cause in 2023-24 P09
CauseMinutesShareNetwork-wideA day, against the same period other yearsTrains cancelled
Network Rail's causes
Track897%8% 3 a day, the most in 5 years-
Signals, points and power373%16% 1 a day, the least in 5 years-
Weather and structures766%7% 3 a day, the most in 5 years5
Autumn292%7% 1 a day, more than 2 of the other 4 years4
External--4% 0 a day, the least in 5 years-
Network management22316%17% 8 a day, more than 3 of the other 4 years135
The operators' causes
Train faults77757%16% 28 a day, the most in 5 years86
Traincrew282%11% 1 a day, more than 2 of the other 4 years1
Stations2<1%3% 0 a day, more than 2 of the other 4 years-
Operations856%5% 3 a day, the most in 5 years-
Operator, other11<1%7% 0 a day, the least in 5 years-

Period by period

Delay minutes a day, period by period. Gridlines every 20 minutes. Hatched periods were under 94% agreed when their file came out, so they may still move. Pick a bar to see that period.

The codes behind it

In 2023-24 P09
CodeWhat Network Rail loggedMinutes
MDTechnical failures below the solebar242
M7Door and Door system faults166
M8Technical failures above the Solebar161
ISTrack defects (other than rail defects) inc. fish plates, wet beds etc.89
XWSevere weather not snow affecting infrastructure the responsibility of Network Rail76
MSPlanned underpowered or shortformed service and or vehicle, incl. exam set swaps68
TOTime lost en-route believed to be Operator cause and information required form operatore (Ops Responsibility)66
MTConfirmed train borne safety system faults (not cab based)64
OHARS / TMS / SARS software problem (excluding scheduling issues and technical failures)56
I5Possession over-run from planned work37
Since 2018
CodeWhat Network Rail loggedMinutes
MDTechnical failures below the solebar3,163
ICTrack circuit failure (including no fault found)2,572
ZSNo Cause ascertainable for a Sub-Threshold Delay causing Threshold Reactionary (where agreed by both parties)2,493
TH(Senior) Conductor/Train Manager2,327
OHARS / TMS / SARS software problem (excluding scheduling issues and technical failures)1,741
M7Door and Door system faults1,715
M8Technical failures above the Solebar1,502
ZUNo Cause Identified After investigation by both Parties1,388
TOTime lost en-route believed to be Operator cause and information required form operatore (Ops Responsibility)1,204
MUDepot operating problem1,037