Liverpool Central Loop Line
1,355 delay minutes
Most of the delay picked up at Liverpool Central Loop Line in the four weeks to 9 December 2023 came from faulty trains.
79% of these minutes were knock-on from something that happened elsewhere first. 100% of them were agreed between Network Rail and the operators when the file came out on 5 Jan 2024.
By cause
| Cause | Minutes | Share | Network-wide | A day, against the same period other years | Trains cancelled |
|---|---|---|---|---|---|
| Network Rail's causes | |||||
| Track | 89 | 7% | 8% | 3 a day, the most in 5 years | - |
| Signals, points and power | 37 | 3% | 16% | 1 a day, the least in 5 years | - |
| Weather and structures | 76 | 6% | 7% | 3 a day, the most in 5 years | 5 |
| Autumn | 29 | 2% | 7% | 1 a day, more than 2 of the other 4 years | 4 |
| External | - | - | 4% | 0 a day, the least in 5 years | - |
| Network management | 223 | 16% | 17% | 8 a day, more than 3 of the other 4 years | 135 |
| The operators' causes | |||||
| Train faults | 777 | 57% | 16% | 28 a day, the most in 5 years | 86 |
| Traincrew | 28 | 2% | 11% | 1 a day, more than 2 of the other 4 years | 1 |
| Stations | 2 | <1% | 3% | 0 a day, more than 2 of the other 4 years | - |
| Operations | 85 | 6% | 5% | 3 a day, the most in 5 years | - |
| Operator, other | 11 | <1% | 7% | 0 a day, the least in 5 years | - |
Period by period
The codes behind it
| Code | What Network Rail logged | Minutes |
|---|---|---|
| MD | Technical failures below the solebar | 242 |
| M7 | Door and Door system faults | 166 |
| M8 | Technical failures above the Solebar | 161 |
| IS | Track defects (other than rail defects) inc. fish plates, wet beds etc. | 89 |
| XW | Severe weather not snow affecting infrastructure the responsibility of Network Rail | 76 |
| MS | Planned underpowered or shortformed service and or vehicle, incl. exam set swaps | 68 |
| TO | Time lost en-route believed to be Operator cause and information required form operatore (Ops Responsibility) | 66 |
| MT | Confirmed train borne safety system faults (not cab based) | 64 |
| OH | ARS / TMS / SARS software problem (excluding scheduling issues and technical failures) | 56 |
| I5 | Possession over-run from planned work | 37 |
| Code | What Network Rail logged | Minutes |
|---|---|---|
| MD | Technical failures below the solebar | 3,163 |
| IC | Track circuit failure (including no fault found) | 2,572 |
| ZS | No Cause ascertainable for a Sub-Threshold Delay causing Threshold Reactionary (where agreed by both parties) | 2,493 |
| TH | (Senior) Conductor/Train Manager | 2,327 |
| OH | ARS / TMS / SARS software problem (excluding scheduling issues and technical failures) | 1,741 |
| M7 | Door and Door system faults | 1,715 |
| M8 | Technical failures above the Solebar | 1,502 |
| ZU | No Cause Identified After investigation by both Parties | 1,388 |
| TO | Time lost en-route believed to be Operator cause and information required form operatore (Ops Responsibility) | 1,204 |
| MU | Depot operating problem | 1,037 |