Lowestoft
662 delay minutes
The biggest share (17%) of the delay picked up at Lowestoft in the four weeks to 9 December 2023 came from autumn leaves.
56% of these minutes were knock-on from something that happened elsewhere first. 94% of them were agreed between Network Rail and the operators when the file came out on 5 Jan 2024, so they may still move.
By cause
| Cause | Minutes | Share | Network-wide | A day, against the same period other years | Trains cancelled |
|---|---|---|---|---|---|
| Network Rail's causes | |||||
| Track | 4 | <1% | 8% | 0 a day, the least in 5 years | - |
| Signals, points and power | 71 | 11% | 16% | 3 a day, more than 2 of the other 4 years | - |
| Weather and structures | 92 | 14% | 7% | 3 a day, the most in 5 years | - |
| Autumn | 113 | 17% | 7% | 4 a day, more than 3 of the other 4 years | - |
| External | 69 | 10% | 4% | 2 a day, more than 3 of the other 4 years | - |
| Network management | 97 | 15% | 17% | 3 a day, more than 2 of the other 4 years | 3 |
| The operators' causes | |||||
| Train faults | 84 | 13% | 16% | 3 a day, more than 1 of the other 4 years | 1 |
| Traincrew | 101 | 15% | 11% | 4 a day, the most in 5 years | - |
| Stations | - | - | 3% | 0 a day, the least in 5 years | - |
| Operations | 2 | <1% | 5% | 0 a day, the least in 5 years | 1 |
| Operator, other | 29 | 4% | 7% | 1 a day, more than 1 of the other 4 years | 3 |
Period by period
The codes behind it
| Code | What Network Rail logged | Minutes |
|---|---|---|
| JK | Flooding not due to exceptional weather | 72 |
| JP | Failure to maintain vegetation within network boundaries in accordance with prevailing Network Rail standards | 67 |
| TG | Driver | 67 |
| QJ | Special working for leaf-fall track circuit operation | 65 |
| M7 | Door and Door system faults | 52 |
| XK | National Grid Power Failure - local area also affected (inc outage, surges, blips where working standby generator/UPS installed) | 40 |
| J3 | Axle Counter Failure | 36 |
| TH | (Senior) Conductor/Train Manager | 32 |
| XN | Road or crossing related incidents inc. cars on line, crossing misuse and priority to emergency services (NOT bridge strikes) | 29 |
| IF | Train Describer/Panel/ARS/SSI/TDM Remote Control failure | 27 |
| Code | What Network Rail logged | Minutes |
|---|---|---|
| JD | Structures - Bridges/tunnels/buildings/retaining walls/sea defences (not bridge strikes) | 3,113 |
| IF | Train Describer/Panel/ARS/SSI/TDM Remote Control failure | 2,744 |
| MU | Depot operating problem | 2,473 |
| MD | Technical failures below the solebar | 2,370 |
| IS | Track defects (other than rail defects) inc. fish plates, wet beds etc. | 2,231 |
| ID | Level crossing faults and failure incl. barrow/foot crossings and crossing treadles | 1,857 |
| M8 | Technical failures above the Solebar | 1,707 |
| M7 | Door and Door system faults | 1,394 |
| JH | Critical Rail Temperature speeds, (other than buckled rails) | 1,363 |
| Q1 | Takeback Pumps | 1,294 |