Leaves on the Line

Lowestoft

LWT Anglia route
CSV JSON

662 delay minutes

The biggest share (17%) of the delay picked up at Lowestoft in the four weeks to 9 December 2023 came from autumn leaves.

56% of these minutes were knock-on from something that happened elsewhere first. 94% of them were agreed between Network Rail and the operators when the file came out on 5 Jan 2024, so they may still move.

By cause

Delay minutes by cause in 2023-24 P09
CauseMinutesShareNetwork-wideA day, against the same period other yearsTrains cancelled
Network Rail's causes
Track4<1%8% 0 a day, the least in 5 years-
Signals, points and power7111%16% 3 a day, more than 2 of the other 4 years-
Weather and structures9214%7% 3 a day, the most in 5 years-
Autumn11317%7% 4 a day, more than 3 of the other 4 years-
External6910%4% 2 a day, more than 3 of the other 4 years-
Network management9715%17% 3 a day, more than 2 of the other 4 years3
The operators' causes
Train faults8413%16% 3 a day, more than 1 of the other 4 years1
Traincrew10115%11% 4 a day, the most in 5 years-
Stations--3% 0 a day, the least in 5 years-
Operations2<1%5% 0 a day, the least in 5 years1
Operator, other294%7% 1 a day, more than 1 of the other 4 years3

Period by period

Delay minutes a day, period by period. Gridlines every 20 minutes. Hatched periods were under 94% agreed when their file came out, so they may still move. Pick a bar to see that period.

The codes behind it

In 2023-24 P09
CodeWhat Network Rail loggedMinutes
JKFlooding not due to exceptional weather72
JPFailure to maintain vegetation within network boundaries in accordance with prevailing Network Rail standards67
TGDriver67
QJSpecial working for leaf-fall track circuit operation65
M7Door and Door system faults52
XKNational Grid Power Failure - local area also affected (inc outage, surges, blips where working standby generator/UPS installed)40
J3Axle Counter Failure36
TH(Senior) Conductor/Train Manager32
XNRoad or crossing related incidents inc. cars on line, crossing misuse and priority to emergency services (NOT bridge strikes)29
IFTrain Describer/Panel/ARS/SSI/TDM Remote Control failure27
Since 2018
CodeWhat Network Rail loggedMinutes
JDStructures - Bridges/tunnels/buildings/retaining walls/sea defences (not bridge strikes)3,113
IFTrain Describer/Panel/ARS/SSI/TDM Remote Control failure2,744
MUDepot operating problem2,473
MDTechnical failures below the solebar2,370
ISTrack defects (other than rail defects) inc. fish plates, wet beds etc.2,231
IDLevel crossing faults and failure incl. barrow/foot crossings and crossing treadles1,857
M8Technical failures above the Solebar1,707
M7Door and Door system faults1,394
JHCritical Rail Temperature speeds, (other than buckled rails)1,363
Q1Takeback Pumps1,294